Rédigé par des étudiants ayant réussi Disponible immédiatement après paiement Lire en ligne ou en PDF Mauvais document ? Échangez-le gratuitement 4,6 TrustPilot
logo-home
Document preview thumbnail
Aperçu 4 sur 99 pages
Examen

New Orleans Second Class Stationary Boilers 661-LA Exam Prep 2026 | Questions & Rationales

Document preview thumbnail
Aperçu 4 sur 99 pages

Prepare confidently for your Louisiana license with this complete practice exam bank for the New Orleans Second Class Stationary Boilers 661-LA test. This study guide features comprehensive practice questions with verified answers and detailed rationales strictly aligned with ASME BPVC Section I, CSD-1, NBIC, and local municipal codes. It is the ultimate resource for stationary engineers looking to master safety protocols, pass their certification on the first try, and advance their industrial maintenance careers.

Aperçu du contenu

Louisiana (New Orleans) Second Class Stationary
Boilers 661-LA 661 Exam 2026

Complete Practice Questions with Correct Answers &
Detailed Rationales

Based on ASME BPVC Section I, CSD-1, NBIC, and City of New
Orleans Requirements


QUESTION 1
What is the correct gas-to-air mixture for a gas-fired boiler?

A) 20% gas to 80% air
B) 25% gas to 75% air
C) 30% gas to 70% air
D) 40% gas to 60% air

C) 30% gas to 70% air

Rationale: The proper gas-to-air mixture for a gas-fired boiler is 30% gas to 70% air. In
special arrangements, the gas percentage can be as high as 100% . This is a critical
combustion parameter tested on the 661-LA exam.




QUESTION 2
How much clearance from the top of the boiler is needed for a high-pressure boiler that
produces 70,000 lbs of steam?

A) 5 feet
B) 6 feet
C) 7 feet
D) 8 feet

C) 7 feet

,Rationale: A high-pressure boiler producing 70,000 lbs of steam requires 7 feet of
clearance from the top of the boiler. This is a specific New Orleans code requirement for
boiler room clearances .




QUESTION 3
How often should a complete external inspection of the boiler be performed?

A) Once per week
B) Once per shift
C) Once per month
D) Once per year

B) Once per shift

Rationale: A complete external inspection of the boiler should be performed once per shift.
This includes checking for leaks, proper operation of safety devices, and general system
integrity .




QUESTION 4
With 24-hour boiler operation, how often should the water level be checked?

A) Every hour
B) Once per shift
C) Every 4 hours
D) Every 6 hours

B) Once per shift

Rationale: With 24-hour operation, the water level must be checked at least once per shift.
This is a critical safety requirement to prevent low-water conditions that can cause boiler
failure .

,QUESTION 5
How often should the Low Water Cutoff (LWCO) be checked?

A) Hourly
B) Once per shift
C) Weekly
D) Monthly

B) Once per shift

Rationale: The Low Water Cutoff should be checked once per shift to ensure it will function
properly in an emergency. The LWCO is a critical safety device that shuts down the burner
when water level drops below safe limits .




QUESTION 6
How often should the High Limit Switch be checked?

A) Once per shift
B) Weekly
C) Monthly
D) Annually

D) Annually

Rationale: The High Limit Switch should be checked annually to verify it will shut down the
boiler at the proper temperature or pressure .




QUESTION 7
How often should the operating control be tested?

A) Once per shift
B) Weekly
C) Monthly
D) Annually

D) Annually

, Rationale: The operating control should be tested annually to ensure it is functioning
correctly and maintaining the proper operating parameters .




QUESTION 8
How often should the testing and inspecting of burner components be performed?

A) Once per shift
B) Weekly
C) Monthly
D) Annually

D) Annually

Rationale: Burner components should be tested and inspected annually to ensure proper
combustion, safety, and efficiency .




QUESTION 9
What is the legal limit of acceptable asbestos particles in the air?

A) 0.01 fibers per cubic centimeter
B) 0.05 fibers per cubic centimeter
C) 0.1 fibers per cubic centimeter
D) 0.5 fibers per cubic centimeter

C) 0.1 fibers per cubic centimeter

Rationale: The legal limit of acceptable asbestos particles is 0.1 fibers per cubic centimeter
of air. This is the OSHA permissible exposure limit (PEL) for asbestos .




QUESTION 10
After opening a boiler for repairs, what percentage of oxygen is needed for safe entry?

Infos sur le Document

Publié le
7 août 2026
Nombre de pages
99
Écrit en
2026/2027
Type
Examen
Contient
Questions et réponses
$33.99

Mauvais document ? Échangez-le gratuitement Dans les 14 jours suivant votre achat et avant le téléchargement, vous pouvez choisir un autre document. Vous pouvez simplement dépenser le montant à nouveau.
Rédigé par des étudiants ayant réussi
Disponible immédiatement après paiement
Lire en ligne ou en PDF

Seller avatar
Les scores de réputation sont basés sur le nombre de documents qu'un vendeur a vendus contre paiement ainsi que sur les avis qu'il a reçu pour ces documents. Il y a trois niveaux: Bronze, Argent et Or. Plus la réputation est bonne, plus vous pouvez faire confiance sur la qualité du travail des vendeurs.
CornelWest
3.7
(261)
Vendu
1631
Abonnés
1128
Éléments
12876
Dernière vente
4 heures de cela



Pourquoi les étudiants choisissent Stuvia

Créé par d'autres étudiants, vérifié par les avis

Une qualité sur laquelle compter : rédigé par des étudiants qui ont réussi et évalué par d'autres qui ont utilisé ce document.

Le document ne convient pas ? Choisis un autre document

Aucun souci ! Tu peux sélectionner directement un autre document qui correspond mieux à ce que tu cherches.

Paye comme tu veux, apprends aussitôt

Aucun abonnement, aucun engagement. Paye selon tes habitudes par carte de crédit et télécharge ton document PDF instantanément.

Student with book image

“Acheté, téléchargé et réussi. C'est aussi simple que ça.”

Alisha Student

Vous travaillez sur vos références ?

Créez des citations précises en APA, MLA et Harvard avec notre générateur de sources gratuit.

Vous travaillez sur vos références ?

Foire aux questions