TSAAS Air Assault - LZ/PZ Operations Test with all Correct
& 100% Verified Answers |Latest Version |Already
Graded A+
What reference is used for LZ/PZ Operations ✔Correct Answer-FM 3-21.38, TM 4-48.09, and
FM3-99
What is the purpose of LZ/PZ operations ✔Correct Answer-Provide navigational aid and air
traffic advisories for army ACFT
What are the phases of LZ/PZ operations? ✔Correct Answer-1. Selecting
2. Marking
3. Controlling
Tactical consideration factors for LZ/PZ operations ✔Correct Answer-1. Location of the
objective in relation to the tentative HLZ
2. Size and Type of unit being supported
3. Estimate the situation based on METT-TC
Technical consideration factors of LZ/PZ operations ✔Correct Answer-1. Formation and
number of ACFT
2. Loads
3. Obstacles
4. Atmospheric conditions
5. Type of aircraft (TDP Size)
6. Routes - Approach / Departure
7 Surface Conditions
TDP Sizes ✔Correct Answer-1) 25 meters: Small Observation- OH-58D, OH-6
2) 35 meters: Small Utility/Attack- UH-1, LUH-72, AH-1
3) 50 meters: Large Utility/Attack- UH-60, AH-64
4) 80 meters: Cargo- MV-22, CH-46, CH-47, CH-53
5) 100 meters: Sling Loads and Unknown Aircraft
6) 125 meters: Sling Loads using long lines(Combat)
7) 150 meters: Sling Loads using long lines at night(Combat)
What is the least secure aircraft formation ✔Correct Answer-Trail
What is the most secure aircraft formation ✔Correct Answer-diamond
Anything over how many inches is considered an obstacle? ✔Correct Answer-18 inches
& 100% Verified Answers |Latest Version |Already
Graded A+
What reference is used for LZ/PZ Operations ✔Correct Answer-FM 3-21.38, TM 4-48.09, and
FM3-99
What is the purpose of LZ/PZ operations ✔Correct Answer-Provide navigational aid and air
traffic advisories for army ACFT
What are the phases of LZ/PZ operations? ✔Correct Answer-1. Selecting
2. Marking
3. Controlling
Tactical consideration factors for LZ/PZ operations ✔Correct Answer-1. Location of the
objective in relation to the tentative HLZ
2. Size and Type of unit being supported
3. Estimate the situation based on METT-TC
Technical consideration factors of LZ/PZ operations ✔Correct Answer-1. Formation and
number of ACFT
2. Loads
3. Obstacles
4. Atmospheric conditions
5. Type of aircraft (TDP Size)
6. Routes - Approach / Departure
7 Surface Conditions
TDP Sizes ✔Correct Answer-1) 25 meters: Small Observation- OH-58D, OH-6
2) 35 meters: Small Utility/Attack- UH-1, LUH-72, AH-1
3) 50 meters: Large Utility/Attack- UH-60, AH-64
4) 80 meters: Cargo- MV-22, CH-46, CH-47, CH-53
5) 100 meters: Sling Loads and Unknown Aircraft
6) 125 meters: Sling Loads using long lines(Combat)
7) 150 meters: Sling Loads using long lines at night(Combat)
What is the least secure aircraft formation ✔Correct Answer-Trail
What is the most secure aircraft formation ✔Correct Answer-diamond
Anything over how many inches is considered an obstacle? ✔Correct Answer-18 inches