NCCCO Mobile Crane Exam




NCCCO Mobile Crane Exam

Questions with Answers & Rationales| Latest Update




Page 1

,NCCCO Mobile Crane Exam



1. Before setting up a mobile crane on a job site, who is responsible for
ensuring the ground conditions are adequate to support the crane and
load?
A. The rigger only
B. The controlling entity, in coordination with the employer and crane
operator
C. The crane manufacturer
D. No one; ground conditions are the crane's problem alone
Answer: B
Rationale: Per OSHA 1926.1402, the controlling entity must ensure ground
conditions are adequate, and if the controlling entity does not have the
requisite knowledge, it must coordinate with the employer/operator to
determine what actions are needed to establish proper support.

2. What is the primary purpose of using outrigger pads (cribbing/mats)
under a mobile crane's outriggers?
A. To level the crane only
B. To distribute the load over a larger surface area and prevent ground
failure
C. To increase the crane's lifting capacity beyond the load chart
D. To reduce fuel consumption
Answer: B
Rationale: Outrigger pads/mats distribute the concentrated point load from
the outrigger float over a wider surface area, reducing the ground bearing
pressure and helping prevent the ground from failing or the crane from
tipping.




Page 2

,NCCCO Mobile Crane Exam


3. A crane operator notices the ground beneath one outrigger is softer
than the others. What should the operator do before beginning lift
operations?
A. Proceed with the lift since three outriggers are firm
B. Stop and ensure adequate support (larger/thicker cribbing) is in place
under all outriggers before lifting
C. Reduce tire pressure to compensate
D. Shift the entire load to the opposite side
Answer: B
Rationale: Uneven or inadequate ground support under any outrigger can
lead to crane instability or tip-over. The operator must ensure all outriggers
are properly and equally supported before beginning any lifting operations.

4. When a mobile crane is set up near an excavation or trench, what
minimum consideration must be addressed regarding proximity to the
edge?
A. No special consideration is required if outriggers are fully extended
B. The crane must be positioned so that the load, boom, or crane itself will
not cause a cave-in or the crane to be unstable, factoring in the angle of
repose of the soil
C. Excavations only matter for crawler cranes, not truck-mounted cranes
D. The crane can be positioned as close as needed as long as a spotter is
present
Answer: B
Rationale: Excavations reduce lateral soil support and increase the risk of
ground collapse under crane loading. The crane must be set back a
sufficient distance based on soil type, angle of repose, and excavation depth
to prevent collapse and crane instability.




Page 3

, NCCCO Mobile Crane Exam


5. What must a crane operator verify regarding overhead power lines
before beginning operations, per OSHA regulations, when working near
lines up to 350 kV?
A. No minimum clearance distance is required if the crane is grounded
B. A minimum clearance of 20 feet must be maintained unless the lines are
de-energized or additional precautions per the standard are taken
C. A minimum clearance of 6 feet is always sufficient
D. Clearance requirements only apply to boom trucks, not lattice boom
cranes
Answer: B
Rationale: OSHA 1926.1408 generally requires a minimum clearance of 20
feet from power lines up to 350 kV for equipment operations, unless the lines
have been confirmed de-energized and visibly grounded, or unless a
documented encroachment prevention plan meeting specific criteria is in
place.

6. Which of the following is a required step before a crane is used on a
site involving assembly/disassembly (A/D) operations?
A. A/D operations do not require any specific planning
B. An assembly/disassembly director who meets qualification requirements
must supervise the operation
C. Only the operator needs to be present
D. The load chart is not needed during assembly
Answer: B
Rationale: OSHA requires that assembly and disassembly operations be
directed by a person who meets the definition of an A/D director, having the
knowledge, experience, and training to identify and address hazards
associated with the A/D process.




Page 4

Document information

Uploaded on
August 6, 2026
Number of pages
51
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$10.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
KelvinBrooks
4.3
(90)
Sold
792
Followers
11
Items
5670
Last sold
3 hours ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions