• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 4 out of 74 pages
Exam (elaborations)

North Carolina Subsurface Wastewater System Actual Exam Questions And Answers With Rationale Latest Update

Document preview thumbnail
Preview 4 out of 74 pages

North Carolina Subsurface Wastewater System Actual Exam Questions And Answers With Rationale Latest Update

Content preview

Exam Coverage Summary
Domain I: Ethical and Legal Issues
 Professional ethics and integrity for certified operators
 State regulations for obtaining and maintaining certification
 Roles: Operator in Responsible Charge (ORC), Back-up ORC, contract operators
 System owner vs. ORC responsibilities
 Disciplinary actions and consequences
 Permitting authority: NC DEQ, Local Health Departments, WPCSOCC
 What ORCs may/may not do without a repair permit
Domain II: Introduction to Wastewater
 Types and sources of wastewater
 Major constituents: BOD, TSS, nutrients, pathogens
 Treatment processes in subsurface systems
 Design flow vs. actual flow calculations
 Mass balance concepts
Domain III: Safety
 Health and safety hazards (confined spaces, H2S, electrical)
 Personal protective equipment requirements
 Public health protection measures
 Electrical safety and when to call licensed electrician
 Plumbing services requirements
Domain IV: Subsurface Wastewater Systems Overview
 System types: conventional, LPP, drip, sand filters, peat biofilters
 Site conditions warranting each system type
 Innovative Approvals requirements
Domain V: System Components
 Collection and Primary Treatment: septic tanks, baffles, compartments
 Advanced/Secondary Pretreatment: aerobic units, media filters, disinfection
 Distribution: gravity, pressure manifold, LPP, drip systems

,  Pumps, controls, dosing (demand, timed, multiple field)
 Dispersal and Soil Treatment: trenches, chambers, gravel
Domain VI: Monitoring and Sampling
 Sampling protocols and requirements
 Groundwater monitoring requirements
 Interpreting monitoring results
Domain VII: Math for Operators
 Tank and pipe volume calculations
 Flow rates and pumping characteristics
 Septic system performance data
 Time clock and telemetry data
 Mass balance calculations
Domain VIII: System Operation and Maintenance
 Reading plans, specifications, permits
 Records and inspection documentation
 Management plans for undocumented systems
 Routine, preventative, and special inspections
 System evaluation and troubleshooting
 Permitting requirements for modifications
Domain IX: Records, Reports, and Contracts
 Maintaining permit and documentation
 Scheduling inspections and sampling
 Filing reports timely
 Contract execution with system owners
North Carolina Specific Regulations
 Separation distances: well (100 ft), property line (10 ft), surface water (50 ft), old
drainfield (20 ft)
 Design flow: 110 gallons/bedroom/day
 Septic tank sizing: 750 gal (1-2 BR), 900 gal (3 BR)
 Deep hole test: minimum 36 inches
 Dosing volume: maximum 20% of design daily flow
 Percolation rate: maximum 60 minutes/inch

,  Vertical separation to water table: minimum 18 inches
 Presoaking: minimum 12 hours
 Inspection frequency: every 1-3 years



Questions 1

1. An ORC discovers that a system owner has made unauthorized modifications to the
distribution system without a permit. What is the ORC's primary responsibility?
A) Ignore the modifications since the owner is responsible
B) Notify the local health department immediately
C) Document the modifications in the inspection report and notify the system owner and local
health department
D) Repair the system to its original condition without notifying anyone

Rationale: The ORC must recognize when system modifications require permits and properly
document violations. Notifying both the owner and regulatory authority is the ethical and
legal obligation under NC regulations. Modifications without permits are violations that
must be reported to protect public health and water resources .

2. A contract operator is taking over management of a system. Before beginning work,
what must be properly executed?
A) A verbal agreement with the property owner
B) A contract with the system owner that addresses all operational responsibilities and
requirements
C) A notification to the neighbors
D) A permit from the local health department

Rationale: The Needs-to-Know document explicitly addresses the importance of properly
executing contracts with system owners and what issues such contracts should cover. A
written contract protects both parties and clearly defines responsibilities, service scope, and
expectations .

3. A certified operator becomes aware that the system owner has been discharging
prohibited wastes into the system. What is the appropriate action?
A) Continue pumping the tank as scheduled and ignore the issue
B) Inform the owner that this is unacceptable and document the conversation in system

, records
C) Immediately terminate the service contract
D) Report the owner to the local health department without discussion

Rationale: The operator's ethical responsibility includes recognizing situations that may
jeopardize operator integrity and certification. Proper documentation and education of the
owner is the professional approach. If the issue continues, regulatory notification may be
necessary .

4. Under North Carolina regulations, who has primary authority for issuing septic
permits and enforcing rules at the local level?
A) NC Department of Environmental Quality
B) Water Pollution Control System Operators Certification Commission
C) Local Health Department
D) Division of Water Resources

Rationale: Authority is delegated to local health departments to issue septic permits, regulate
installations, and enforce NC laws and rules. This is clearly established in NC regulations
for onsite wastewater systems .

5. An ORC is asked by a system owner to provide false inspection records to help sell
the property. What should the ORC do?
A) Provide the records as requested since the owner is paying for services
B) Refuse to falsify records and inform the owner of the legal consequences
C) Provide partial records that are incomplete but not technically false
D) Report the owner immediately to the Commission without warning

Rationale: Professional ethics demand integrity in recordkeeping. Providing false
information jeopardizes operator certification and constitutes a disciplinary violation. The
operator must maintain accurate records that reflect true inspection results .

6. According to 15A NCAC 08G .0201, what is the timeline for submitting an Operator
Designation Form after a new system is completed?
A) Within 30 days of system completion
B) 60 days prior to wastewater being introduced into the system
C) Within 90 days of system operation
D) At the time of the first inspection

Document information

Uploaded on
August 5, 2026
Number of pages
74
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$23.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
SmartAchiever
4.5
(140)
Sold
263
Followers
123
Items
1065
Last sold
1 month ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions