Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 60 pages
Exam (elaborations)

NEW MEXICO (NM) GF-9 UTILITY LINES PRACTICE EXAM QUESTIONS AND ANSWERS ALREADY GRADED A+. 100% Verified Solutions | Updated Per Latest Guidelines | Graded A+...

Document preview thumbnail
Preview 4 out of 60 pages

NEW MEXICO (NM) GF-9 UTILITY LINES PRACTICE EXAM QUESTIONS AND ANSWERS ALREADY GRADED A+. 100% Verified Solutions | Updated Per Latest Guidelines | Graded A+...

Content preview

NEW MEXICO (NM) GF-9 UTILITY LINES PRACTICE EXAM QUESTIONS AND ANSWERS ALREADY GRADED
A+. 100% Verified Solutions | Updated Per Latest Guidelines | Graded A+...




CORE DOMAINS

New Mexico Contractor Licensing Law and Regulations (NMSA 60-13)
Earthwork, Excavation, Trenching, and Compaction
Gravity and Pressure Water Distribution Systems
Sanitary Sewer and Storm Drainage System Construction
Pipe Materials, Jointing, and Bedding Specifications
Trench Safety, Shoring, and OSHA Standards
Traffic Control and Work Zone Safety (MUTCD)
Pavement Restoration and Asphalt Patching
New Mexico Environment Department (NMED) and Utility Notification (811)
Business Management, Estimating, and Project Administration




This practice assessment is designed for candidates preparing for the New Mexico GF-9 Utility Lines Contractor
Licensing Examination. The examination evaluates the technical competencies required to construct, install, and
repair underground utility systems, including water mains, sanitary sewers, and storm drains, in compliance with

,New Mexico state regulations, local municipal standards, and OSHA safety requirements. Key skills assessed
include interpreting construction plans and profiles, installing and testing water and sewer lines, performing
compaction and trench safety, restoring pavement and surfaces, managing traffic control, and administering
business operations. Questions simulate realistic field and office scenarios to test critical thinking, code application,
and professional judgment. The format consists of 100 original multiple-choice questions that mirror the cognitive
demands, style, and difficulty distribution of the live proctored examination.




SECTION ONE

Question 1

According to New Mexico law, a GF-9 Utility Lines contractor is licensed to install:

A. Only residential plumbing fixtures
B. Water mains, sanitary sewers, storm drains, and related underground utility lines
C. Electrical transmission lines only
D. Building foundations only

🟢 Correct Answer: B
🔴 RATIONALE: The GF-9 classification specifically covers the installation of underground utility lines, including
water, sewer, and storm systems, but does not include building plumbing or electrical work.

,Question 2

In New Mexico, the "One-Call" notification (811) must be made at least how many working days before starting
excavation?

A. 1 working day
B. 2 working days
C. 5 working days
D. 10 working days

🟢 Correct Answer: B
🔴 RATIONALE: The New Mexico One-Call law requires a 2-working-day notice (48 hours, excluding weekends
and holidays) to allow utility owners time to locate and mark their lines.




Question 3

What is the minimum slope for a 4-inch diameter sanitary sewer lateral pipe per standard plumbing and sewer
codes?

A. 1/16 inch per foot
B. 1/8 inch per foot
C. 1/4 inch per foot
D. 1/2 inch per foot

, 🟢 Correct Answer: C
🔴 RATIONALE: To achieve a self-scouring velocity of 2 feet per second, smaller-diameter pipes require a
steeper slope. 4-inch and 6-inch laterals require a minimum of 1/4 inch per foot.




Question 4

A contractor is installing a PVC water main. The pipe material is C900 PVC. What type of joint is typically used
for this pressure pipe?

A. Solvent-cemented joint
B. Bell and spigot with an elastomeric gasket
C. Welded joint
D. Threaded joint

🟢 Correct Answer: B
🔴 RATIONALE: C900 PVC pressure pipe uses an integral bell and a rubber gasket (push-on joint) designed to
provide a watertight, flexible seal.




Question 5

According to OSHA regulations, an excavation 7 feet deep in Type C soil requires what protective system?

Document information

Uploaded on
August 4, 2026
Number of pages
60
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$30.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
tutorlex
3.0
(2)
Sold
8
Followers
0
Items
1632
Last sold
4 hours ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions