S-12 CITYWIDE SPRINKLER
SYSTEMS, S12 sprinkler test
S12 FDNY Exam (Latest 2026/ 2027
Update) Questions and Verified
Answers| 100% Correct| Grade A
What’s inside:
S-12 FDNY Exam (Latest 2026–2027 Update)
Citywide Sprinkler Systems – Verified Questions & Answers
Comprehensive Guide to Sprinkler System Inspection, Testing &
Maintenance
Perfect for Self-Study, Classroom Review & Final Exam
Preparation
Includes Building Owner & Certificate of Fitness (CoF)
Responsibilities
, Answer: OWNER
Q: THE __________ IS RESPONSIBLE TO MAINTAIN SPRINKLER SYS. AND TO
DETERMINE QUALIFICATIONS.
Answer: 3
Q: RECORDS OF ALL INSPECTIONS AND MX SHALL BE MAINTAINED ON PREMISES
FOR A MIN. OF __________ YEARS.
Answer: IMPAIRMENT COORDINATOR
Q: THE BUILDING OWNER SHALL ASSIGN A(N) ____________ TO COMPLY WITH
REQUIREMENTS.
Answer: 1
Q: REGULAR MX AND MINOR REPAIRS NOT AFFECTING MORE THAN ________
FLOOR(S) ARE CONSIDERED PLANNED REMOVAL FROM SERVICE.
Answer: 1
Q: SHUTDOWNS AFFECTING MORE THAN _________ FLOOR(S) ARE CONSIDERED
UNPLANNED OUT OF SERVICE CONDITIONS.
Answer: 8
Q: NOTIFICATION TO FDNY IS NOT REQUIRED PROVIDED SYSTEM IS RETURNED
TO SERVICE WITHIN ______ HOURS.
Answer: OWNER OF THE BUILDING
Q: FOR UNPLANNED REMOVAL FROM SERVICE THE COF HOLDER SHALL
IMMEDIATELY REPORT CONDITION TO THE ___________ AND THE FIRE DEPT.
Answer: 30
Q: IF A MINOR DEFECT IS OBSERVED IT SHALL BE CORRECTED WITHIN
_________ DAYS OR IT WILL BE CONSIDERED AN IMPAIRMENT.
Answer: OUT OF SERVICE
Q: WHAT DOES \OOS\ STAND FOR?
Answer: TAGS
Q: OOS SYSTEMS SHALL BE IDENTIFIED BY PLACING ________ AT FIRE DEPT.
CONNECTIONS SYS. CONTROL VALVES AND FIRE COMMAND CENTER
, Answer: MASTER FIRE SUPPRESSION PIPING CONTRACTOR
Q: A _______ SHALL BE REQUIRED TO POST TAGS AT MAIN CONTROL VALVE
AND ANY SECTIONAL VALVES.
Answer: DRAIN TEST RESULTS
Q: __________ SHALL BE POSTED ON THE TAG INDICATING BOTH STATIC AND
FLOW PRESSURES BEFORE AND AFTER.
Answer: NO IMPAIRMENT WAS FOUND
Q: GREEN TAGS INDICATE THAT __________.
Answer: MAIN CONTROL VALVE
Q: GREEN TAGS WILL BE PLACED ON THE ____________.
Answer: RED
Q: SYSTEMS PARTIALLY OR FULLY OUT OF SERVICE SHALL HAVE A
____________ TAG PLACED ON THE MAIN CONTROL VALVE.
Answer: WHITE
Q: A _________ DISC OF 8-9 INCHES SHALL BE PLACED ON CONNECTIONS TO
INDICATE THE SYSTEM IS FULLY OUT OF SERVICE.
Answer: BLUE
Q: A ________ DISC OF 8-9 INCHES SHALL BE PLACED ON CONNECTIONS TO
INDICATE THE SYSTEM IS PARTIALLY OUT OF SERVICE.
Answer: INSURANCE
Q: THE IMPAIRMENT COORDINATOR WILL NOTIFY THE ___________ CARRIER
CENTRAL STATION AND OCCUPANTS.
Answer: IMPAIRMENT COORDINATOR
Q: PRIOR TO RETURNING A SYS. TO SERVICE THE ___________ SHALL ENSURE
THAT NECESSARY TESTS AND INSPECTIONS ARE CONDUCTED.
Answer: 50 40
Q: GLYCERIN NOT GREATER THAN _________ PERCENT OR GLYCOL NOT
GREATHER THAN ________ PERCENT SHALL BE USED TO PROTECT FROM FREEZING.
Answer: MAIN CONTROL VALVE
SYSTEMS, S12 sprinkler test
S12 FDNY Exam (Latest 2026/ 2027
Update) Questions and Verified
Answers| 100% Correct| Grade A
What’s inside:
S-12 FDNY Exam (Latest 2026–2027 Update)
Citywide Sprinkler Systems – Verified Questions & Answers
Comprehensive Guide to Sprinkler System Inspection, Testing &
Maintenance
Perfect for Self-Study, Classroom Review & Final Exam
Preparation
Includes Building Owner & Certificate of Fitness (CoF)
Responsibilities
, Answer: OWNER
Q: THE __________ IS RESPONSIBLE TO MAINTAIN SPRINKLER SYS. AND TO
DETERMINE QUALIFICATIONS.
Answer: 3
Q: RECORDS OF ALL INSPECTIONS AND MX SHALL BE MAINTAINED ON PREMISES
FOR A MIN. OF __________ YEARS.
Answer: IMPAIRMENT COORDINATOR
Q: THE BUILDING OWNER SHALL ASSIGN A(N) ____________ TO COMPLY WITH
REQUIREMENTS.
Answer: 1
Q: REGULAR MX AND MINOR REPAIRS NOT AFFECTING MORE THAN ________
FLOOR(S) ARE CONSIDERED PLANNED REMOVAL FROM SERVICE.
Answer: 1
Q: SHUTDOWNS AFFECTING MORE THAN _________ FLOOR(S) ARE CONSIDERED
UNPLANNED OUT OF SERVICE CONDITIONS.
Answer: 8
Q: NOTIFICATION TO FDNY IS NOT REQUIRED PROVIDED SYSTEM IS RETURNED
TO SERVICE WITHIN ______ HOURS.
Answer: OWNER OF THE BUILDING
Q: FOR UNPLANNED REMOVAL FROM SERVICE THE COF HOLDER SHALL
IMMEDIATELY REPORT CONDITION TO THE ___________ AND THE FIRE DEPT.
Answer: 30
Q: IF A MINOR DEFECT IS OBSERVED IT SHALL BE CORRECTED WITHIN
_________ DAYS OR IT WILL BE CONSIDERED AN IMPAIRMENT.
Answer: OUT OF SERVICE
Q: WHAT DOES \OOS\ STAND FOR?
Answer: TAGS
Q: OOS SYSTEMS SHALL BE IDENTIFIED BY PLACING ________ AT FIRE DEPT.
CONNECTIONS SYS. CONTROL VALVES AND FIRE COMMAND CENTER
, Answer: MASTER FIRE SUPPRESSION PIPING CONTRACTOR
Q: A _______ SHALL BE REQUIRED TO POST TAGS AT MAIN CONTROL VALVE
AND ANY SECTIONAL VALVES.
Answer: DRAIN TEST RESULTS
Q: __________ SHALL BE POSTED ON THE TAG INDICATING BOTH STATIC AND
FLOW PRESSURES BEFORE AND AFTER.
Answer: NO IMPAIRMENT WAS FOUND
Q: GREEN TAGS INDICATE THAT __________.
Answer: MAIN CONTROL VALVE
Q: GREEN TAGS WILL BE PLACED ON THE ____________.
Answer: RED
Q: SYSTEMS PARTIALLY OR FULLY OUT OF SERVICE SHALL HAVE A
____________ TAG PLACED ON THE MAIN CONTROL VALVE.
Answer: WHITE
Q: A _________ DISC OF 8-9 INCHES SHALL BE PLACED ON CONNECTIONS TO
INDICATE THE SYSTEM IS FULLY OUT OF SERVICE.
Answer: BLUE
Q: A ________ DISC OF 8-9 INCHES SHALL BE PLACED ON CONNECTIONS TO
INDICATE THE SYSTEM IS PARTIALLY OUT OF SERVICE.
Answer: INSURANCE
Q: THE IMPAIRMENT COORDINATOR WILL NOTIFY THE ___________ CARRIER
CENTRAL STATION AND OCCUPANTS.
Answer: IMPAIRMENT COORDINATOR
Q: PRIOR TO RETURNING A SYS. TO SERVICE THE ___________ SHALL ENSURE
THAT NECESSARY TESTS AND INSPECTIONS ARE CONDUCTED.
Answer: 50 40
Q: GLYCERIN NOT GREATER THAN _________ PERCENT OR GLYCOL NOT
GREATHER THAN ________ PERCENT SHALL BE USED TO PROTECT FROM FREEZING.
Answer: MAIN CONTROL VALVE