Work Order
Give this one a try later!
A document that details specific maintenance tasks to be completed.
Break-in Period
Give this one a try later!
The period time just after installation when equipment achieves peak
operation performance. Along with the wear-out period, this is when
breakdowns are most likely to occur.
, Vibration Analysis
Give this one a try later!
The monitoring of individual component vibration characteristics to analyze
the component condition. Vibration is analyzed for frequency(CPM),
velocity, acceleration, and phase.
Work Priority
Give this one a try later!
The order in which work should be done based on importance.
Troubleshooting
Give this one a try later!
The systematic investigation of the cause of system problems in order to
determine the best solution.
Wear-out Period
Give this one a try later!
Give this one a try later!
A document that details specific maintenance tasks to be completed.
Break-in Period
Give this one a try later!
The period time just after installation when equipment achieves peak
operation performance. Along with the wear-out period, this is when
breakdowns are most likely to occur.
, Vibration Analysis
Give this one a try later!
The monitoring of individual component vibration characteristics to analyze
the component condition. Vibration is analyzed for frequency(CPM),
velocity, acceleration, and phase.
Work Priority
Give this one a try later!
The order in which work should be done based on importance.
Troubleshooting
Give this one a try later!
The systematic investigation of the cause of system problems in order to
determine the best solution.
Wear-out Period
Give this one a try later!