• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 4 out of 73 pages
Exam (elaborations)

Pmt 3600V Exam 2 Comprehensive Practice Question Bank: 200 Evm Mastery Questions With Correct Answers, Detailed Rationales, And Complete Solution Sets Covering All Earned Value Management Topics Including Performance Measurement Baselines, Variance Analys

Document preview thumbnail
Preview 4 out of 73 pages

PMT 3600V EXAM 2 COMPREHENSIVE PRACTICE QUESTION BANK: 200 EVM MASTERY QUESTIONS WITH CORRECT ANSWERS, DETAILED RATIONALES, AND COMPLETE SOLUTION SETS COVERING ALL EARNED VALUE MANAGEMENT TOPICS INCLUDING PERFORMANCE MEASUREMENT BASELINES, VARIANCE ANALYSIS, FORECASTING, INDICES, BUDGETING, REBASELINING (OTB/OTS), AND INTEGRATED BASELINE REVIEWS 1. What is the definition of BCWS in Earned Value Management? A) The total cost incurred for work accomplished B) The budgeted amount for work scheduled to be completed by a given time C) The actual cost of work performed D) The estimated cost at project completion Answer: B Rationale: BCWS stands for Budgeted Cost for Work Scheduled, which is the planned value (PV). It represents the authorized budget assigned to the work that is scheduled to be accomplished within a specific time period. 2. Which formula correctly calculates Cost Variance (CV)? A) CV = BCWP - ACWP B) CV = BCWS - BCWP C) CV = ACWP - BCWP D) CV = BAC - EAC Answer: A Rationale: Cost Variance is the difference between the earned value (BCWP) and the actual cost (ACWP). A positive CV indicates the project is under budget. 3. What does a Schedule Performance Index (SPI) of 1.2 indicate? A) The project is behind schedule by 20% B) The project is ahead of schedule by 20% C) The project is over budget by 20% D) The project is under budget by 20% Answer: B Rationale: SPI = BCWP / BCWS. An SPI greater than 1.0 indicates that the project is progressing faster than planned, meaning it is ahead of schedule. 4. What is the primary purpose of an Integrated Baseline Review (IBR)? A) To audit the contractor's financial records B) To verify that the Performance Measurement Baseline is realistic and covers the full technical scope C) To approve contract change orders D) To finalize the project budget Answer: B Rationale: The IBR is a joint review between the customer and contractor to ensure the PMB is achievable, adequately planned, and includes all the authorized technical work scope. 5. Which type of variance analysis focuses on the difference between the earned value and the planned value? A) Cost Variance B) Schedule Variance C) Estimate at Completion Variance D) Budget Variance Answer: B Rationale: Schedule Variance (SV = BCWP - BCWS) specifically measures the difference between the work actually performed and the work that was scheduled to be performed. 6. What is the correct formula for Estimate at Completion (EAC) if the current CPI is expected to continue for the remainder of the project? A) EAC = ACWP + (BAC - BCWP) B) EAC = BAC / CPI C) EAC = BAC / (CPI * SPI) D) EAC = ACWP + (BAC - BCWP) / CPI Answer: B Rationale: When the current cost performance (CPI) is projected to continue, the most common formula is EAC = BAC / CPI, which extrapolates the current efficiency to the remaining work. 7. What does the term "Undistributed Budget" (UB) refer to? A) Budget set aside for unforeseen risks B) Budget that has not yet been assigned to specific control accounts or work packages C) The total contract budget D) Budget for profit and overhead Answer: B Rationale: Undistributed Budget is a temporary holding category for budget that is authorized but not yet allocated to specific control accounts or work packages. Once identified, it is distributed. 8. If a project has a To Complete Performance Index (TCPI) of 0.95 based on the BAC, what does this imply? A) The project must improve efficiency by 5% to meet the budget B) The project has a 5% cost buffer and can relax efficiency slightly to meet the budget C) The project is 5% behind schedule D) The project is 5% over budget Answer: B Rationale: TCPI = (Remaining Work) / (Remaining Funds). A TCPI 1.0 indicates that the remaining work can be performed with less efficiency than planned and still meet the budget, meaning there is a buffer. 9. What is the Over Target Baseline (OTB) used for? A) To increase the contract fee B) To formally rebaseline the program when the estimated cost exceeds the contract budget base C) To reduce the project scope D) To defer costs to the next fiscal year Answer: B Rationale: An OTB is implemented when the total estimated cost to complete the contract exceeds the Contract Budget Base (CBB). It establishes a new baseline to reflect the realistic cost to complete. 10. Which of the following best describes the Management Reserve (MR)? A) Budget allocated specifically for known risks B) Budget held by the project manager to address unforeseen risks within the contract scope C) Budget used exclusively for profit D) Budget for contract modifications

Content preview

PMT 3600V EXAM 2 COMPREHENSIVE PRACTICE QUESTION
BANK: 200 EVM MASTERY QUESTIONS WITH CORRECT
ANSWERS, DETAILED RATIONALES, AND COMPLETE SOLUTION
SETS COVERING ALL EARNED VALUE MANAGEMENT TOPICS
INCLUDING PERFORMANCE MEASUREMENT BASELINES,
VARIANCE ANALYSIS, FORECASTING, INDICES, BUDGETING,
REBASELINING (OTB/OTS), AND INTEGRATED BASELINE
REVIEWS




1. What is the definition of BCWS in Earned Value Management?
A) The total cost incurred for work accomplished
B) The budgeted amount for work scheduled to be completed by a
given time
C) The actual cost of work performed
D) The estimated cost at project completion
Answer: B
Rationale: BCWS stands for Budgeted Cost for Work Scheduled, which is
the planned value (PV). It represents the authorized budget assigned to
the work that is scheduled to be accomplished within a specific time
period.
2. Which formula correctly calculates Cost Variance (CV)?
A) CV = BCWP - ACWP
B) CV = BCWS - BCWP
C) CV = ACWP - BCWP
D) CV = BAC - EAC

,Answer: A
Rationale: Cost Variance is the difference between the earned value
(BCWP) and the actual cost (ACWP). A positive CV indicates the project
is under budget.
3. What does a Schedule Performance Index (SPI) of 1.2 indicate?
A) The project is behind schedule by 20%
B) The project is ahead of schedule by 20%
C) The project is over budget by 20%
D) The project is under budget by 20%
Answer: B
Rationale: SPI = BCWP / BCWS. An SPI greater than 1.0 indicates that
the project is progressing faster than planned, meaning it is ahead of
schedule.
4. What is the primary purpose of an Integrated Baseline Review
(IBR)?
A) To audit the contractor's financial records
B) To verify that the Performance Measurement Baseline is realistic and
covers the full technical scope
C) To approve contract change orders
D) To finalize the project budget
Answer: B
Rationale: The IBR is a joint review between the customer and
contractor to ensure the PMB is achievable, adequately planned, and
includes all the authorized technical work scope.
5. Which type of variance analysis focuses on the difference between
the earned value and the planned value?
A) Cost Variance

,B) Schedule Variance
C) Estimate at Completion Variance
D) Budget Variance
Answer: B
Rationale: Schedule Variance (SV = BCWP - BCWS) specifically measures
the difference between the work actually performed and the work that
was scheduled to be performed.
6. What is the correct formula for Estimate at Completion (EAC) if the
current CPI is expected to continue for the remainder of the project?
A) EAC = ACWP + (BAC - BCWP)
B) EAC = BAC / CPI
C) EAC = BAC / (CPI * SPI)
D) EAC = ACWP + (BAC - BCWP) / CPI
Answer: B
Rationale: When the current cost performance (CPI) is projected to
continue, the most common formula is EAC = BAC / CPI, which
extrapolates the current efficiency to the remaining work.
7. What does the term "Undistributed Budget" (UB) refer to?
A) Budget set aside for unforeseen risks
B) Budget that has not yet been assigned to specific control accounts or
work packages
C) The total contract budget
D) Budget for profit and overhead
Answer: B
Rationale: Undistributed Budget is a temporary holding category for
budget that is authorized but not yet allocated to specific control
accounts or work packages. Once identified, it is distributed.

, 8. If a project has a To Complete Performance Index (TCPI) of 0.95
based on the BAC, what does this imply?
A) The project must improve efficiency by 5% to meet the budget
B) The project has a 5% cost buffer and can relax efficiency slightly to
meet the budget
C) The project is 5% behind schedule
D) The project is 5% over budget
Answer: B
Rationale: TCPI = (Remaining Work) / (Remaining Funds). A TCPI < 1.0
indicates that the remaining work can be performed with less efficiency
than planned and still meet the budget, meaning there is a buffer.
9. What is the Over Target Baseline (OTB) used for?
A) To increase the contract fee
B) To formally rebaseline the program when the estimated cost exceeds
the contract budget base
C) To reduce the project scope
D) To defer costs to the next fiscal year
Answer: B
Rationale: An OTB is implemented when the total estimated cost to
complete the contract exceeds the Contract Budget Base (CBB). It
establishes a new baseline to reflect the realistic cost to complete.
10. Which of the following best describes the Management Reserve
(MR)?
A) Budget allocated specifically for known risks
B) Budget held by the project manager to address unforeseen risks
within the contract scope
C) Budget used exclusively for profit
D) Budget for contract modifications

Document information

Uploaded on
August 2, 2026
Number of pages
73
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$16.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
maingirose
4.3
(4)
Sold
35
Followers
0
Items
2363
Last sold
7 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions