CDT ACTUAL EXAM TEST PAPER FULL QUESTIONS CORRECT RESPONSES
CDT Final Paper 2026/2027 Questions and Answers
Verified Solutions Latest Update
Question:
2. General Requirements are part of: a) Supplementary Conditions. b) Bidding Requirements. c)
Specifications. d) Summary of Work.
Answer:
c) Specifications.
Question:
3. The three essential considerations in the evaluation of a product are: a) Requirements, Criteria,
and Tests. b) Costs, Maintenance, and Installation. c) Life Cycle Cost, Installation Cost, and
Maintenance Cost. d) Case studies, Failures, and Problems.
Answer:
a) Requirements, Criteria, and Tests.
Question:
4. Whose responsibility is it to furnish the Shop Drawings? a) The Architect/Engineer b) The
Contractor c) The Owner d) The Subcontractor.
Answer:
b) The Contractor
Question:
5. The division of the Work among multiple prime Contracts is described in: a) Instructions to
Bidders. b) Supplementary Conditions. c) Division 01. d) Special Conditions.
Answer:
c) Division 01.
,Question:
6. During the Project Conception Stage, the A/E may be retained to: a) Develop outline
specifications b) Describe the character of the mechanical system c) Prepare renderings d) Assist in
financial feasibility studies.
Answer:
d) Assist in financial feasibility studies
Question:
7. What is the main purpose of MasterFormat? a) for scheduling, value management, recording of
design data and managing costs. b) used during the planning stage of a project. c) to organize the
Project Manual, reference keynotes and detailed cost estimates. d) when there is a standardized need
for information to appear upon each page of a project manual.
Answer:
c) to organize the Project Manual, reference keynotes and detailed cost estimates.
Question:
8. The person who becomes secondarily liable for another's debt or performance is called the: a)
Guarantee b) Warrantor c) Guarantor d) Warrantee.
Answer:
c) Guarantor
Question:
9. Integrated projects are distinguished by all of the following characteristics except: a)
Development of virtual project model through input from a collaborative team b) Trust-based
collaboration between project team members c) Maximized efficiency through design, fabrication,
and construction d) "Just as needed" team involvement to reduce owner's pre-construction expenses.
Answer:
d) "Just as needed" team involvement to reduce owner's pre-construction expenses
Question:
, 10. Outline Specifications are written for a) only Divisions 02-14 where actual products are
discussed b) Divisions 01-49 c) only Divisions 01-14 (excluding mechanical and electrical) d) the
exclusive use of the A/E.
Answer:
b) Divisions 01-49
Question:
11. An example of a MasterFormat Level 3 specification Section is: a) 05 00 00 Metals. b) 05 20 00
Metal Joists. c) 05 21 00 Steel Joist Framing. d) 05 21 19 Open Web Steel Joist Framing.
Answer:
d) 05 21 19 Open Web Steel Joist Framing.
Question:
12. What activities take place in the Project Conception Stage? a) The engineers develop the
mechanical and electrical systems. b) The site is selected and the demolition is done. c) Feasibility
studies and budget is set. d) The program is evaluated and the engineers are selected.
Answer:
c) Feasibility studies and budget is set.
Question:
13. The document recommended to organize preliminary construction information into a standard
order on the basis of systems and assemblies is: a) MasterFormat b) Uniformat c) Outline
Specifications d) Project Manual.
Answer:
b) Uniformat
Question:
14. All design and construction drawings can be classified as one of two types of views: a) Numeric
and graphic. b) Vertical and horizontal. c) Scaled and nonscaled. d) Exterior and interior.
CDT Final Paper 2026/2027 Questions and Answers
Verified Solutions Latest Update
Question:
2. General Requirements are part of: a) Supplementary Conditions. b) Bidding Requirements. c)
Specifications. d) Summary of Work.
Answer:
c) Specifications.
Question:
3. The three essential considerations in the evaluation of a product are: a) Requirements, Criteria,
and Tests. b) Costs, Maintenance, and Installation. c) Life Cycle Cost, Installation Cost, and
Maintenance Cost. d) Case studies, Failures, and Problems.
Answer:
a) Requirements, Criteria, and Tests.
Question:
4. Whose responsibility is it to furnish the Shop Drawings? a) The Architect/Engineer b) The
Contractor c) The Owner d) The Subcontractor.
Answer:
b) The Contractor
Question:
5. The division of the Work among multiple prime Contracts is described in: a) Instructions to
Bidders. b) Supplementary Conditions. c) Division 01. d) Special Conditions.
Answer:
c) Division 01.
,Question:
6. During the Project Conception Stage, the A/E may be retained to: a) Develop outline
specifications b) Describe the character of the mechanical system c) Prepare renderings d) Assist in
financial feasibility studies.
Answer:
d) Assist in financial feasibility studies
Question:
7. What is the main purpose of MasterFormat? a) for scheduling, value management, recording of
design data and managing costs. b) used during the planning stage of a project. c) to organize the
Project Manual, reference keynotes and detailed cost estimates. d) when there is a standardized need
for information to appear upon each page of a project manual.
Answer:
c) to organize the Project Manual, reference keynotes and detailed cost estimates.
Question:
8. The person who becomes secondarily liable for another's debt or performance is called the: a)
Guarantee b) Warrantor c) Guarantor d) Warrantee.
Answer:
c) Guarantor
Question:
9. Integrated projects are distinguished by all of the following characteristics except: a)
Development of virtual project model through input from a collaborative team b) Trust-based
collaboration between project team members c) Maximized efficiency through design, fabrication,
and construction d) "Just as needed" team involvement to reduce owner's pre-construction expenses.
Answer:
d) "Just as needed" team involvement to reduce owner's pre-construction expenses
Question:
, 10. Outline Specifications are written for a) only Divisions 02-14 where actual products are
discussed b) Divisions 01-49 c) only Divisions 01-14 (excluding mechanical and electrical) d) the
exclusive use of the A/E.
Answer:
b) Divisions 01-49
Question:
11. An example of a MasterFormat Level 3 specification Section is: a) 05 00 00 Metals. b) 05 20 00
Metal Joists. c) 05 21 00 Steel Joist Framing. d) 05 21 19 Open Web Steel Joist Framing.
Answer:
d) 05 21 19 Open Web Steel Joist Framing.
Question:
12. What activities take place in the Project Conception Stage? a) The engineers develop the
mechanical and electrical systems. b) The site is selected and the demolition is done. c) Feasibility
studies and budget is set. d) The program is evaluated and the engineers are selected.
Answer:
c) Feasibility studies and budget is set.
Question:
13. The document recommended to organize preliminary construction information into a standard
order on the basis of systems and assemblies is: a) MasterFormat b) Uniformat c) Outline
Specifications d) Project Manual.
Answer:
b) Uniformat
Question:
14. All design and construction drawings can be classified as one of two types of views: a) Numeric
and graphic. b) Vertical and horizontal. c) Scaled and nonscaled. d) Exterior and interior.