COSC 275 Final Exam Palmer EXAM Questions with 100%
Correct Answers | Verified | Updated (Actual Exam)
2025\2026
Leave the first rating
Students also studied
COSC 275 Final Exam Palmer VHL Lección 7 Vocab COSC 275 - Exam 2 CO
115 terms 73 terms 77 terms 97
brennon_mason Preview setarakhowjazadah Preview kyle_mangum90 Preview
Practice questions for this set
Learn 1 /7 Study with Learn
Material used to prevent the passage of vapor or moisture into a structure or another
material, thus preventing condensation within them.
Choose an answer
1 Flashing 2 Vapor Barriers
Don't know?
Terms in this set (115)
Estimating The process of determining the anticipated cost of materials, labor, and
equipment of a proposed project.
Take-off The process in which detailed lists are compiled, based on drawings and
specifications, of all the material and equipment necessary to construct a
project. The cost estimator uses this list to calculate how much it will cost to
build the project.
Quantities Measured amounts of construction items expressed in their customary units.
, Quantification In estimating an activity to translate project scope information into resource
quantities suitable for
Quantity survey A detailed analysis of material and equipment required to construct a project.
Area A measurement of a given planar region or of the surface of a solid.
Area method A construction cost estimating system employing unit square foot costs
multiplied by the adjusted gross floor area of a building.
Length The longest dimension of an object.
Linear measurement A unit or system of units for measuring length: 12" = 1', 3' = 1
yard, 1 yard = 0.9144 meters, 1 mile = 5,280 feet.
Dimension A distance between two points, lines, or planes.
Specifications Documents that define the qualitative requirements for products, materials, and
workmanship upon which the contract for construction is based.
Drawings Graphic illustrations depicting the dimensions, design, and location of a project.
Generally including plans, elevations, details, diagrams, schedules, and
sections.
Addendum A document describing an addition, change, correction, or modification to
contract documents. An addendum is issued by the design professional during
the bidding period or prior to the award of contract, and is the primary method
of informing bidders of modifications to the work during the bidding process.
Addenda become part of the contract documents.
Amendment A modification of the contract by a subsequent agreement. This does not
change the entire existing contract but does alter the terms of the affected
provisions or requirements.
Grade The surface or level of the ground.
Level A term used to describe any horizontal surface that has all points at the same
elevation and thus does not tilt or slope.
Correct Answers | Verified | Updated (Actual Exam)
2025\2026
Leave the first rating
Students also studied
COSC 275 Final Exam Palmer VHL Lección 7 Vocab COSC 275 - Exam 2 CO
115 terms 73 terms 77 terms 97
brennon_mason Preview setarakhowjazadah Preview kyle_mangum90 Preview
Practice questions for this set
Learn 1 /7 Study with Learn
Material used to prevent the passage of vapor or moisture into a structure or another
material, thus preventing condensation within them.
Choose an answer
1 Flashing 2 Vapor Barriers
Don't know?
Terms in this set (115)
Estimating The process of determining the anticipated cost of materials, labor, and
equipment of a proposed project.
Take-off The process in which detailed lists are compiled, based on drawings and
specifications, of all the material and equipment necessary to construct a
project. The cost estimator uses this list to calculate how much it will cost to
build the project.
Quantities Measured amounts of construction items expressed in their customary units.
, Quantification In estimating an activity to translate project scope information into resource
quantities suitable for
Quantity survey A detailed analysis of material and equipment required to construct a project.
Area A measurement of a given planar region or of the surface of a solid.
Area method A construction cost estimating system employing unit square foot costs
multiplied by the adjusted gross floor area of a building.
Length The longest dimension of an object.
Linear measurement A unit or system of units for measuring length: 12" = 1', 3' = 1
yard, 1 yard = 0.9144 meters, 1 mile = 5,280 feet.
Dimension A distance between two points, lines, or planes.
Specifications Documents that define the qualitative requirements for products, materials, and
workmanship upon which the contract for construction is based.
Drawings Graphic illustrations depicting the dimensions, design, and location of a project.
Generally including plans, elevations, details, diagrams, schedules, and
sections.
Addendum A document describing an addition, change, correction, or modification to
contract documents. An addendum is issued by the design professional during
the bidding period or prior to the award of contract, and is the primary method
of informing bidders of modifications to the work during the bidding process.
Addenda become part of the contract documents.
Amendment A modification of the contract by a subsequent agreement. This does not
change the entire existing contract but does alter the terms of the affected
provisions or requirements.
Grade The surface or level of the ground.
Level A term used to describe any horizontal surface that has all points at the same
elevation and thus does not tilt or slope.