ACQ 1010 Module 3 ACTUAL UPDATED QUESTIONS AND CORRECT ANSWERS
Major Capability Acquisition (MCA) Phases Materiel Solutions Analysis (MSA) > Technology Maturation and Risk Reduction
(TMRR) > Engineering & Manufacturing Development (EMD) > Production &
Deployment (P&D) > Operations & Support (O&S)
Major Capability Acquisition (MCA) Milestones Milestone A (initiates TMRR) > Milestone B (initiates EMD) > Milestone C (initiates
P&D)
Major Capability Acquisition (MCA) Decision Points Materiel Development Decision (MDD) > Capability Development Document
(CDD) Validation > Development Request for Proposal (RFP) Decision > and
Released Full-Rate Production "(FRP)
Materiel Solutions Analysis (MSA) In this MCA phase the most promising technology is picked to meet the user need
identified in the Initial Capabilities Document.
Technology Maturation and Risk Reduction (TMRR) In this MCA phase we reduce risk by proving the reliability of the technology
through competitive prototyping.
Engineering and Manufacturing Development (EMD) In this MCA phase we complete the build to design, prove the design works and
can be manufactured.
Major Capability Acquisition (MCA) Phases Materiel Solutions Analysis (MSA) > Technology Maturation and Risk Reduction
(TMRR) > Engineering & Manufacturing Development (EMD) > Production &
Deployment (P&D) > Operations & Support (O&S)
Major Capability Acquisition (MCA) Milestones Milestone A (initiates TMRR) > Milestone B (initiates EMD) > Milestone C (initiates
P&D)
Major Capability Acquisition (MCA) Decision Points Materiel Development Decision (MDD) > Capability Development Document
(CDD) Validation > Development Request for Proposal (RFP) Decision > and
Released Full-Rate Production "(FRP)
Materiel Solutions Analysis (MSA) In this MCA phase the most promising technology is picked to meet the user need
identified in the Initial Capabilities Document.
Technology Maturation and Risk Reduction (TMRR) In this MCA phase we reduce risk by proving the reliability of the technology
through competitive prototyping.
Engineering and Manufacturing Development (EMD) In this MCA phase we complete the build to design, prove the design works and
can be manufactured.