Content preview

ACQ 1010 Fundamentals of Systems Acquisition Management ACTUAL
UPDATED QUESTIONS AND CORRECT ANSWERS

Which of the following institutions issues directives and The Executive Branch
regulations and formulates, directs, and executes national
security policy?


A system can be defined as: All elements (e.g. hardware, software, logistical support, personnel) needed to
assist the Department of Defense (DoD) to conduct its mission of deterring or
winning war.


In order to be successful in acquisition management, Use of new material or processes
which of the following PERFORMANCE risk factors
needed to be addressed?



A program estimates that they will require eventual Acquisition Category (ACAT) 1
expenditure for Research, Development, Test and
evaluation (RDT&E) of more than $535 million (FY2020) or
procurement of more than $3.065 billion (FY 2020). What
Acquisition Category (ACAT) designation will this
program have?


Select the Department of Defense (DoD's) decision- Planning, Programming, Budgeting and Execution (PPBE)
support system described as; " DoD primary resources
allocation process that is calendar-driven."


Who is the Defense Acquisition Executive? Under Secretary of Defense (Acquisition and Sustainment)(USD(A&S))


Programs are divided into acquisition categories (ACATs) True
based primarily on program cost.1) Programs are divided
into acquisition categories (ACATs) based primarily on
program cost.


Which of the following Federal Government regulations Federal Acquisition Regulation (FAR)
govern DoD acquisitions activities?


What is a characteristic of an Integrated Product Team They are multidisciplinary group of people who are collectively responsible for
(IPT)? delivering a defined product or process.


What is the purpose of a capabilities based-assessment To analyze the military's capabilities needs and gaps and recommended both
(CBA)? material and non-material solutions.

, What is the name of the document that is prepared by the Initial Capability Document (ICD)
user to document a need that requires a material
solution?


The primary objective of the Joint Capabilities Integration True
and Development System (JCIDS) is to ensure that the
capabilities required by the joint Warfighter to
successfully execute their missions are identified with
their associated operational performance criteria.




Which document provides information on the Manual for the operation of the JCIDS
development of requirements documents?


What are Requirements Managers responsible for Identifying operational performance requirements
providing?


If an Initial Capability Document is developed, which of Material
the following solutions does the Capabilities-Based
assessment (CBA) support?


What is the primary objective of the Joint capabilities To ensure that capabilities required by the warfighter are identified and meet
Integration and Development system (JCIDS)? operational performance criteria


All performance attributes designated as Joint True
Performance Requirements (JPR) will be upgraded to Key
Performance Parameters (KPP)?


Select the document that establishes policies and Chairman of the Joint Chiefs of Staff Instruction (CJCSI) 5123.01
procedures for developing, reviewing, validating and
approving the capability documents required by the Joint
Capabilities integration and Development Systems
(JCIDS).


Which International Acquisition and Exportability Industrial
objective addresses the need to strengthen domestic
and allied defense industrial bases?


What is the purpose of the Engineering and To develop, build and test a product to verify that all operational and derived
Manufacturing Development (EMD) phase? requirements have been met to support production or deployment decision.


In order for the Program Manager to maximize True
affordability from program initiation through post-
production, the Acquisition Strategy must evolve and
become increasingly more definitive.



In what document does the Program Manager (PM) Product Support Plan (PSS)
address the demilitarization and disposal requirements?

Document information

Uploaded on
August 1, 2026
Number of pages
9
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$15.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Briwisescore
3.0
(1)
Sold
25
Followers
5
Items
11419
Last sold
3 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions