CEPS Exam 1 UPDATED ACTUAL QUESTIONS AND CORRECT ANSWERS To succeed in the construction industry ... - CORRECT ANSWER Time Quality Safety Scope Function Relationship Contractor's Estimator - CORRECT ANSWER Cost a) Determine actual cost of project for bidding purposes. b) Familiar with company's detailed cost data of labor and material. c) Familiar with construction method to be used. d) Knowledge of materials suppliers and the corresponding discounts they offer. Engineer's Estimator - CORRECT ANSWER plumbing, electrical, etc. b) Familiar with specialty labor rate and materials of the company. c) Familiar with specialty installation methods. d) Knowledge of specialty contractor material and tools. a) Determine specialty cost, e.g. Ability to forecast cost required to complete Purpose of Estimating - CORRECT ANSWER project in accordance to plan and specifications. Ability to reasonably provide accurate direct cost for materials, labor, and equipment. Ability to develop a bid price by adding the direct cost to indirect cost (overhead, contingencies, and profit.) Ability to determine the probable real cost and the probable real time. Conceptual Estimate - CORRECT ANSWER owner would like to build No drawings/specs available Feasibility Study Using "some" unit of measurement e.g., Cost per bed in a hospital project About ± 20% - 30% of accuracy Preliminary Estimate - CORRECT ANSWER with overall dimensions 5%~40% of the drawings Typically prepared by the architect or Produced from the description of what the Produced from a preliminary set of drawings

Content preview

CEPS Exam 1 UPDATED ACTUAL
QUESTIONS AND CORRECT ANSWERS
To succeed in the construction industry ... - CORRECT ANSWER Cost

Time

Quality

Safety

Scope

Function

Relationship



Contractor's Estimator - CORRECT ANSWER a) Determine actual cost of project

for bidding purposes.

b) Familiar with company's detailed

cost data of labor and material.

c) Familiar with construction

method to be used.

d) Knowledge of materials suppliers

and the corresponding discounts

they offer.



Engineer's Estimator - CORRECT ANSWER a) Determine specialty cost, e.g.

plumbing, electrical, etc.

b) Familiar with specialty labor rate

and materials of the company.

c) Familiar with specialty

installation methods.

d) Knowledge of specialty

contractor material and tools.

, Purpose of Estimating - CORRECT ANSWER Ability to forecast cost required to complete
project in accordance to plan

and specifications.



Ability to reasonably provide accurate direct cost for materials, labor, and

equipment.



Ability to develop a bid price by adding the direct cost to indirect cost

(overhead, contingencies, and profit.)



Ability to determine the probable real cost and the probable real time.



Conceptual Estimate - CORRECT ANSWER Produced from the description of what the

owner would like to build



No drawings/specs available



Feasibility Study



Using "some" unit of measurement

➢e.g., Cost per bed in a hospital project



About ± 20% - 30% of accuracy



Preliminary Estimate - CORRECT ANSWER Produced from a preliminary set of drawings

with overall dimensions



5%~40% of the drawings



Typically prepared by the architect or

architect/engineer to reflect expected cost, and

Document information

Uploaded on
August 1, 2026
Number of pages
7
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$11.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Sold
62
Followers
2
Items
8582
Last sold
6 days ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions