Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 24 pages
Exam (elaborations)

NASCLA ACCREDITED JOURNEYMAN ELECTRICIAN EXAM REVIEWS WITH COMPLETE ACTUAL EXAM QUESTIONS AND CORRECT VERIFIED ANSWERS/ ALREADY GRADED A+ (MOST RECENT!!)

Document preview thumbnail
Preview 3 out of 24 pages

NASCLA ACCREDITED JOURNEYMAN ELECTRICIAN EXAM REVIEWS WITH COMPLETE ACTUAL EXAM QUESTIONS AND CORRECT VERIFIED ANSWERS/ ALREADY GRADED A+ (MOST RECENT!!)

Content preview

1|Page


NASCLA ACCREDITED JOURNEYMAN ELECTRICIAN EXAM
REVIEWS WITH COMPLETE ACTUAL EXAM QUESTIONS AND
CORRECT VERIFIED ANSWERS/ ALREADY GRADED A+ (MOST
RECENT!!)


1. An electrician is assigned to install a new branch circuit supplying
receptacles in a commercial office. Before selecting the conductor size,
the electrician reviews the expected load, installation method, and
ambient temperature. Which factor is most critical when determining
the minimum conductor ampacity?


A. The color of the conductor insulation
B. The calculated load and applicable installation conditions
C. The manufacturer's panelboard warranty
D. The number of receptacle faceplates


Answer: B


Rationale: Conductor ampacity should be selected based on the
calculated electrical load while considering installation conditions
such as ambient temperature and conductor grouping.


2. During a routine inspection, an electrician discovers that several
metal junction boxes are not bonded to the equipment grounding

,2|Page


conductor. What is the primary purpose of bonding these metal
enclosures?


A. To reduce voltage drop
B. To provide a low-impedance path for fault current
C. To increase available fault current
D. To improve lighting efficiency


Answer: B


Rationale: Bonding provides a continuous, low-impedance path that
allows protective devices to operate quickly during a ground fault.


3. While troubleshooting a three-phase motor, an electrician
determines that the motor rotates in the wrong direction. Which
corrective action should be performed first?


A. Replace the overload relay.
B. Reverse any two phase conductors.
C. Replace the motor.
D. Increase the breaker size.


Answer: B

, 3|Page




Rationale: Reversing any two phase conductors changes the direction
of rotation of a three-phase motor.


4. An electrician must verify that a circuit is de-energized before
beginning maintenance. Which instrument is most appropriate?


A. Clamp ammeter
B. Voltage tester or properly rated multimeter
C. Infrared thermometer
D. Phase rotation meter


Answer: B


Rationale: A voltage tester or multimeter is used to confirm the
absence of voltage before work begins.


5. An electrical panel contains several loose conductor terminations.
What is the most likely result if these conditions are not corrected?


A. Reduced conductor resistance
B. Excessive heating and possible equipment damage
C. Increased circuit efficiency

Document information

Uploaded on
July 31, 2026
Number of pages
24
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$20.21

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
AceExam1
3.5
(11)
Sold
40
Followers
1
Items
3117
Last sold
2 weeks ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions