Exam (elaborations)

NEVADA (NV) A-7 EXCAVATING & GRADING PRACTICE EXAM QUESTIONS AND ANSWERS ALREADY GRADED A+. 100% VERIFIED SOLUTIONS | UPDATED PER LATEST GUIDELINES | GRADED A+...

Document preview thumbnail
Preview 4 out of 68 pages

NEVADA (NV) A-7 EXCAVATING & GRADING PRACTICE EXAM QUESTIONS AND ANSWERS ALREADY GRADED A+. 100% VERIFIED SOLUTIONS | UPDATED PER LATEST GUIDELINES | GRADED A+...

Content preview

NEVADA (NV) A-7 EXCAVATING & GRADING PRACTICE EXAM QUESTIONS AND ANSWERS ALREADY
GRADED A+. 100% VERIFIED SOLUTIONS | UPDATED PER LATEST GUIDELINES | GRADED A+...

Core Domains

Nevada State Contractors Board A-7 Classification and Regulations
Site Preparation, Clearing, and Grubbing
Soil Classification, Properties, and Testing Methods
Excavation, Trenching, and Shoring Safety (OSHA Subpart P)
Grading Operations, Cut and Fill Calculations
Compaction Methods, Equipment, and Density Testing
Erosion Control, Stormwater Management, and SWPPP Compliance
Heavy Equipment Operation, Maintenance, and Safety
Estimating, Blueprint Reading, and Surveying for Earthwork
Nevada Utility Locating (811), Damage Prevention, and Business Law

Introduction

This practice examination is designed to assess the comprehensive knowledge required for the Nevada A-7
Excavating and Grading Contractor license. The exam evaluates competencies in earthwork operations including
site clearing, mass excavation, trenching, backfilling, compaction, and grading. The 100-question multiple-choice
format includes scenario-based questions that test the application of OSHA Subpart P trenching safety standards,
soil mechanics principles, and Nevada-specific environmental regulations to real-world job site conditions.
Candidates must demonstrate critical thinking in cut and fill calculations, equipment selection, SWPPP

,implementation, and shoring system design. Mastery of this material confirms the professional decision-making
skills necessary to excavate and grade safely, efficiently, and in compliance with all applicable codes and standards
in the State of Nevada.




SECTION ONE

Question 1
According to the Nevada State Contractors Board, the A-7 classification authorizes a licensed contractor to
perform which scope of work?
A. Only residential foundation excavation
B. Excavating, grading, trenching, and earthmoving work including site preparation, mass excavation, and
associated hauling
C. Only underground utility installation
D. General building construction including framing and roofing

🟢 Correct Answer:
B

🔴 RATIONALE:
The Nevada A-7 classification (Excavating and Grading) covers a broad scope of earthwork activities including
site clearing, mass excavation, trenching, grading, compaction, and the hauling of excavated materials. It is
distinct from the A-10 classification for underground utilities and from general building classifications.

,Question 2
According to OSHA Subpart P, at what depth must a trench in Type B soil be provided with a protective system
such as sloping, shoring, or a trench shield?
A. 4 feet
B. 5 feet
C. 6 feet
D. 8 feet

🟢 Correct Answer:
B

🔴 RATIONALE:
OSHA 1926.652 requires that trenches 5 feet or more in depth must have a protective system in place
regardless of soil type, unless the excavation is made entirely in stable rock. Even for shallower trenches, a
competent person must evaluate the need for protection.




Question 3
In Nevada, before commencing any excavation, a contractor is required by law to contact which service to
locate underground utilities?
A. The local police department
B. Nevada 811 (the state's one-call notification center)
C. The Nevada Department of Transportation only
D. The county assessor's office

, 🟢 Correct Answer:
B

🔴 RATIONALE):
Nevada Revised Statutes require all excavators to contact Nevada 811 at least two working days before digging
begins. The 811 service coordinates with member utility companies to mark the location of underground lines,
preventing damage, injury, and service interruptions.




Question 4
A soil sample has a wet weight of 4.5 pounds and a dry weight of 3.8 pounds. What is the moisture content of
the soil?
A. 12.0 percent
B. 15.5 percent
C. 18.4 percent
D. 21.0 percent

🟢 Correct Answer:
C

🔴 RATIONALE):
Moisture content is calculated as (Wet Weight - Dry Weight) / Dry Weight × 100. (4.5 - 3.8) / 3.8 = 0..8 =
0.1842, or 18.4%. This fundamental calculation is used throughout earthwork for compaction control and soil
classification.

Document information

Uploaded on
July 30, 2026
Number of pages
68
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$30.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
tutorlex
3.0
(2)
Sold
8
Followers
0
Items
1632
Last sold
5 hours ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions