ROOFING EXAM WITH CORRECT ACTUAL
QUESTIONS AND CORRECTLY WELL DEFINED
ANSWERS LATEST ALREADY GRADED A+
Terms in this set (76)
You are selected as a roofing Alternate
contractor to bid on a project for
installing a new TPO system thathas
been specified for an existing
building. Along with the new
specified TPO system, the owneris
also interested in knowing the
difference in cost to install a new
EPDM system instead. Thecost to
install a new EPDM system instead
of the new specified TPO system on
your bid will be classified as ________.
, You have been selected as a 44620
qualified roofing contractor to
install 30,000 SF of modified
bitumenroof. You will have one five-
man crew for this project and their
associated rate as follows:
a. One Foreman ($60 / hr.)
b. One Mechanic ($50 / hr.)
c. Three Laborers / Helpers ($40 /
hr.)
Assuming that you will require 970
total man hours, what would be
your total labor cost for this
project?
in regard to roofing safety, motion Warning line systems are an important
stopping systems are an important component of motion stopping systems that must
component for fall protection be flagged maximum 6 feet with highly visible
systems. Which of the following material.
statement is NOT true regarding
motion stopping system?
Which of the following items is NOT Labor Cost
included in General Conditions
when estimating for a roofing
project?
QUESTIONS AND CORRECTLY WELL DEFINED
ANSWERS LATEST ALREADY GRADED A+
Terms in this set (76)
You are selected as a roofing Alternate
contractor to bid on a project for
installing a new TPO system thathas
been specified for an existing
building. Along with the new
specified TPO system, the owneris
also interested in knowing the
difference in cost to install a new
EPDM system instead. Thecost to
install a new EPDM system instead
of the new specified TPO system on
your bid will be classified as ________.
, You have been selected as a 44620
qualified roofing contractor to
install 30,000 SF of modified
bitumenroof. You will have one five-
man crew for this project and their
associated rate as follows:
a. One Foreman ($60 / hr.)
b. One Mechanic ($50 / hr.)
c. Three Laborers / Helpers ($40 /
hr.)
Assuming that you will require 970
total man hours, what would be
your total labor cost for this
project?
in regard to roofing safety, motion Warning line systems are an important
stopping systems are an important component of motion stopping systems that must
component for fall protection be flagged maximum 6 feet with highly visible
systems. Which of the following material.
statement is NOT true regarding
motion stopping system?
Which of the following items is NOT Labor Cost
included in General Conditions
when estimating for a roofing
project?