Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

New Mexico EL-1J Electrical Distribution Journeyman Exam – 200 Practice Questions with Answers & Explanations (NM CID)

Rating
-
Sold
-
Pages
93
Grade
A+
Uploaded on
25-07-2026
Written in
2025/2026

New Mexico EL-1J Electrical Distribution Journeyman Exam – 200 Practice Questions with Answers & Explanations (NM CID) | i nstant Download Table of Contents: Section 1: Safety, OSHA & NFPA 70E (Questions 1 – 40) Section 2: Overhead Line Construction (Questions 41 – 80) Section 3: Underground Distribution Systems (Questions 81 – 110) Section 4: Transformers, Substations & Protection (Questions 111 – 140) Section 5: New Mexico Administrative Code (NM AC) & Licensing (Questions 141 – 170) Section 6: Electrical Theory & Calculations (Questions 171 – 200) Includes: Answer Key with Detailed Explanations for Every Question Covers: NESC, OSHA 1910.269, NFPA 70E, NMAC 14.6.6.10, Distribution Systems, Substations, and Electrical Theory

Show more Read less
Institution
New Mexico EL-1J Electrical Distribution Journeyma
Course
New Mexico EL-1J Electrical Distribution Journeyma

Content preview

New Mexico EL-1J Electrical Distribution
Journeyman Exam – 200 Practice Questions with
Answers & Explanations (NM CID) |instant
Download
Table of Contents:

Section 1: Safety, OSHA & NFPA 70E (Questions 1–40)
Section 2: Overhead Line Construction (Questions 41–80)
Section 3: Underground Distribution Systems (Questions 81–110)
Section 4: Transformers, Substations & Protection (Questions 111–140)
Section 5: New Mexico Administrative Code (NMAC) & Licensing (Questions 141–170)
Section 6: Electrical Theory & Calculations (Questions 171–200)

Includes: Answer Key with Detailed Explanations for Every Question

Covers: NESC, OSHA 1910.269, NFPA 70E, NMAC 14.6.6.10, Distribution Systems,
Substations, and Electrical Theory




Section 1: Safety, OSHA, and NFPA 70E (Questions 1-40)

1. According to NESC, what is the minimum approach distance for qualified workers

on energized 25 kV lines?

A) 2 ft 1 in

B) 2 ft 4 in

,C) 2 ft 7 in

D) 3 ft

Answer: C) 2 ft 7 in

Explanation: NESC Table 410-1 specifies minimum approach distances based on voltage.

For 25 kV phase-to-phase, the listed distance for qualified workers is 2 ft 7 in .

2. Which OSHA standard specifically governs safety requirements for electric power

generation, transmission, and distribution work?

A) 1910.1200 (Hazard Communication)

B) 1910.269

C) 1926.1402 (Cranes)

D) 1910.333 (Electrical safe work practices)

Answer: B) 1910.269

Explanation: OSHA 1910.269 is the dedicated standard for power generation, transmission,

and distribution, covering minimum approach distances, PPE, and work practices for line

workers .

3. Under NFPA 70E, what is the primary purpose of establishing an arc-flash

boundary?

A) To limit the distance a worker can stand from a faulted conductor

B) To define the area where personal protective equipment (PPE) is required

,C) To determine the maximum voltage a system can carry

D) To set the minimum spacing between conductors on a pole

Answer: B) To define the area where personal protective equipment (PPE) is required

Explanation: The arc-flash boundary marks the distance within which a worker could receive

a second-degree burn; PPE must be worn inside this boundary .

4. The minimum approach distance (MAD) for a 15 kV uninsulated overhead line

under OSHA 1910.269 is:

A) 10 ft

B) 12 ft

C) 15 ft

D) 18 ft

Answer: B) 12 ft

Explanation: OSHA Table 1-1 (1910.269) specifies a minimum approach distance of 12 feet

for uninsulated conductors up to 15 kV phase-to-phase .

5. In a lockout/tagout (LOTO) procedure for a high-voltage breaker, which step must

be performed first?

A) Apply the lock

B) Verify zero voltage with a test instrument

, C) Remove the fuse

D) Notify the control room

Answer: B) Verify zero voltage with a test instrument

Explanation: OSHA 1910.333 and 1910.269 require verification of de-energization (testing

for absence of voltage) before applying LOTO devices .

6. What is the primary purpose of grounding in electrical distribution systems?

A) Cost reduction

B) Personnel safety and equipment protection

C) Voltage regulation

D) Power factor improvement

Answer: B) Personnel safety and equipment protection

Explanation: Grounding provides a low-impedance path for fault current, allowing protective

devices to operate quickly and reducing step and touch potentials .

7. The "Call Before You Dig" law in New Mexico primarily aims to:

A) Prevent damage to underground gas pipelines only

B) Protect all underground utilities from excavation damage

C) Ensure proper grounding of buried cables

D) Reduce the cost of street repairs

Written for

Institution
New Mexico EL-1J Electrical Distribution Journeyma
Course
New Mexico EL-1J Electrical Distribution Journeyma

Document information

Uploaded on
July 25, 2026
Number of pages
93
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

  • electrical theory
$36.00
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller
Seller avatar
bestsellers2026

Also available in package deal

Thumbnail
Package deal
New Mexico EL-1J Electrical Distribution Journeyman Exam 3 VERSIONS
-
3 2026
$ 50.00 More info

Get to know the seller

Seller avatar
bestsellers2026 south college
View profile
Follow You need to be logged in order to follow users or courses
Sold
9
Member since
3 weeks
Number of followers
1
Documents
503
Last sold
1 day ago

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions