CEPSCI PRACTICE TEST QUESTIONS WITH
CORRECT ANSWERS


1972 clean water act - CORRECT ANSWER✔✔-Administered by the US
environmental protection agency (EPA) Created the NPDES


1987 - CORRECT ANSWER✔✔-Amendment to CWA CALLED WATER
QUALITY ACT


NPDES in south carolina - CORRECT ANSWER✔✔-South Carolina is
NPDES delegated state.


NPDES regulations are administered by - CORRECT ANSWER✔✔-
SCDHEC


CGP authorizes - CORRECT ANSWER✔✔-stormwater discharges from
construction sites


Who must obtain NPDES coverage - CORRECT ANSWER✔✔-land
disturbing activities greater than or equal to 1 acre

,-land disturbance less than 1 ac within 1/2 miles of water body in SC
costal zone


NPDES permits are issued to - CORRECT ANSWER✔✔-operator-person
or company for a particular discharge


primary permittee - CORRECT ANSWER✔✔--has day to day operational
control to ensure compliance with SWPP
-typically the owner or developer


primary permittee responsibilites - CORRECT ANSWER✔✔-submit NOI,
Preparation of the C_SWPPP


Secondary permittee - CORRECT ANSWER✔✔-individual lot owner or
residential builder that conducts land disturbing activity limited to an
individual lot or group of lots as part of approved LCP of development


contractors - CORRECT ANSWER✔✔-must on Contractor Certification-
D-0437


On-Site SWPPP - CORRECT ANSWER✔✔-SCDHEC CGP, NOI, NPDES
coverage approval letter, Contractor Certifications, Local Approvals,
USACE approvals, Critical area permit(coast)

, OS_SWPPP - CORRECT ANSWER✔✔-a copy of signed and certified
SWPPP, NOI, and CGP coverage letter from DHEC must be retained at
site or electronically accessible


minor modification to ON-SWPPP - CORRECT ANSWER✔✔-minor
modifications made directly in the field,do not need approval by DHEC-
additional BMP's, removal of disturbed areas


major modifications to OS-SWPPP - CORRECT ANSWER✔✔-must be
made by qualified individual and submitted to DHEC or appropriate
delegated entity for approval


Phased plan requirement > 5 - CORRECT ANSWER✔✔-include a phased
stormwater management plan which identifies all BMP's and grading
work conducted during a specific portion of the sites construction
sequence. Each phase identified on at least one separate plan sheet.


Phased plan requirement < 10 but > 5 acres - CORRECT ANSWER✔✔-at
least two separate plan phases are required - initial land disturbance
phase - stabilization phase


Phased plan requirement ≥ 10 acres - CORRECT ANSWER✔✔-at least 3
separate plan phases are required - initial land disturbance phase -
construction phase - stabilization phase

Document information

Uploaded on
July 24, 2026
Number of pages
23
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$15.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Lectphilip
4.0
(41)
Sold
278
Followers
6
Items
26130
Last sold
1 day ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions