Questions & Verified Answers 2026–2027 Complete Exam
Prep
Construction quality management - correct answers -The performance of tasks, which ensure that
construction is performed according to plans and specifications, on time, within a defined budget, and a
safe work environment.
Quality - correct answers -Conformance to properly developed requirements
Purpose of CQM - correct answers -The government's efforts, separate from, but in coordination and
cooperation with the contractor, assure that the quality set by the plans and specifications is achieved.
Contractor quality control function - correct answers -To assure that the completed project meets all
quality requirements of the contract.
Contractor benefits of CQM - correct answers -Increased profit and production, better communications,
planning, improved organizational skills, and outstanding performance evaluations to obtain future
contracts.
Two factors cause construction industry to become highly specialized - correct answers -Changing
market and increased tech and regulations
Factors that will influence both the govt and construction industry in the future - correct answers -New
govt regulations, greater influence from customer, improvement of QC and QA requirements,
construction-oriented mgmt info systems, formal partnering involving stakeholders, more reliance on
design-build, more consideration for life cycle requirements, increased performance based incentives
1
, Pre construction submittals - correct answers -Required prior to or at start of construction or the next
major phase on a multi phase contract
Preconstruction submittals include: - correct answers -Scheduled and a tabular list of locations,
features, and other pertinent information regarding products, materials, equipment, or components to
be used in work
Product data - correct answers -Catalog cuts, illustrations, schedules, diagrams, performance charts,
instructions, systems and equipment
Samples - correct answers -Fabricated or I fabricated physical examples of materials, equipment, or
workmanship that illustrate functional and aesthetic characteristics of material or product that establish
standards
Design data - correct answers -Calculations, mix designs, analyses pertaining to a part of work
Test reports - correct answers -Signed by authorized official of laboratory that a material, product or
system to be provided has been tested in accord with specified requirements, unless otherwise
specified, must have been done within 3 years of date of contract award
Certificates - correct answers -Statements printed on the manufacturer's letterhead and signed by
responsible officials of manufacturer's product, system, or material meets spec requirements. Must be
dated after award of project contract and clearly name the project
Manufacturer's instructions - correct answers -Preprinted material describing installation of a product,
system, or material, including special notices and concerning impedances, hazards, and safety
instructions
2