Certification ACTUAL UPDATED QUESTIONS AND CORRECT ANSWERS
The 1970's law that set into place the regulation of the clean water act
stormwater is:
-the federal pollution discharge elimination rule
-the stormwater pollution control act
-the national water control act
-the clean water act
Requirements for managing stormwater activity on a NPDES
construction site are outlined in the following regulation
-NOI
-NPDES
-NOT
-DOT
Which of the following is never an allowable stormwater discharge from contaminated groundwater
discharge from a construction site?
-discharge from burrow areas
-discharge from contaminated groundwater
-discharge from dewatering activities
-discharge from staging areas
, The notice of termination can be filed when all construction activity, inside and outside the building, is complete and
-general contractor applies seed and mulch near the end permanent stabilization has been verified as adequate to meet permit
of the project requirements
-at the end of rainy season
-all construction activity, inside and outside the building,
is complete and permanent stabilization has been
verified as adequate to meet permit requirements
-only offsite street work is left
Relative to stormwater permitting, all of the following submit the notice of termination (NOT)
must occur before construction starts except
-prepare the SWPPP
-determine the operator(s)
-submit the notice of intent (NOI)
-submit the notice of termination (NOT)
The stormwater notice of intent (NOI) must be submitted after the SWPPP is prepared and before starting construction
-after the sediment discharge
-after the SWPPP is prepared and before starting
construction
-after stormwater BMPs have been installed
- after stormwater inspectors issue a violation
Potential pollutant source stored on a construction site all of the above
may include
-petroleum storage tanks
-soil amendments
-masonry materials
-all of the above
The SWPPP implementation sequence may be modified after consulting with the project SWPPP designer (CEC) and, if required, the
-as the qualified inspector deems necessary project owner and receiving written approval
-after consulting with the project SWPPP designer (CEC)
and, if required, the project owner and receiving written
approval
-it you experience a rain event on your project site
-after discussing runoff problems with your BMP installer
A SWPPP site map will show all of the following except Notices of Violation
-locations of BMPs
-Notices of Violation
-phasing and sequences
-limits of disturbance
Which of the following information is to be posted at the all of the above
entrance to the site?
-construction site notice
-permit authorization
-location of the SWPPP
-all of the above