SCWS SPECIFIC 108 - CIVIL ENGINEER SUPPORT EQUIPMENT (CESE) QUESTIONS AND
ANSWERS | LATEST STUDY GUIDE 2026/2027
What is BEEP - ANS ✔✔Battalion Equipment Evaluation Program
Purpose of BEEP - ANS ✔✔Provide battalion with an in-depth eval of CESE allowances, facilities,
tools and materials. Keep up-to-date condition.
Purpose of NAVFAC P-300 - ANS ✔✔Instructions, guidelines, and procedures to manage the
transportation program, including funds and equipment.
Purpose of COMFIRSTNCDINST - ANS ✔✔(Red Book) to establish policy, assign action and
provide guidance for the Naval Construction Force Equipment Management Program.
Purpose of NAVFAC P-307 - ANS ✔✔Ensure Weight Handling Equipment (WHE) is safte to
operate. Inspection, repair, alteration, etc...
NAVSEA 4790.BC - ANS ✔✔3M: Maintenance & Material Management is designed to provide
standards for planning, scheduling, controlling and performing maintenance.
What is "Deadlined" - ANS ✔✔Equipment that cannot be returned to service and determined
that repairs are required and parts are not obtainable within 3 Days.
What is IEM - ANS ✔✔Inactive Equipment intentionally designated inactive for a specified
amount of time for maintenance.
Status I - ANS ✔✔Equipment that will remain onboard and not schedule for maintenance &
inactive for 7 days or longer.
ANSWERS | LATEST STUDY GUIDE 2026/2027
What is BEEP - ANS ✔✔Battalion Equipment Evaluation Program
Purpose of BEEP - ANS ✔✔Provide battalion with an in-depth eval of CESE allowances, facilities,
tools and materials. Keep up-to-date condition.
Purpose of NAVFAC P-300 - ANS ✔✔Instructions, guidelines, and procedures to manage the
transportation program, including funds and equipment.
Purpose of COMFIRSTNCDINST - ANS ✔✔(Red Book) to establish policy, assign action and
provide guidance for the Naval Construction Force Equipment Management Program.
Purpose of NAVFAC P-307 - ANS ✔✔Ensure Weight Handling Equipment (WHE) is safte to
operate. Inspection, repair, alteration, etc...
NAVSEA 4790.BC - ANS ✔✔3M: Maintenance & Material Management is designed to provide
standards for planning, scheduling, controlling and performing maintenance.
What is "Deadlined" - ANS ✔✔Equipment that cannot be returned to service and determined
that repairs are required and parts are not obtainable within 3 Days.
What is IEM - ANS ✔✔Inactive Equipment intentionally designated inactive for a specified
amount of time for maintenance.
Status I - ANS ✔✔Equipment that will remain onboard and not schedule for maintenance &
inactive for 7 days or longer.