Boiler Drum - CORRECT ANSWER-Cylindrical vessel for steam generation.
Insulation Area - CORRECT ANSWER-Surface area needing thermal insulation.
Proper Fractions - CORRECT ANSWER-Fractions with numerator smaller than
denominator.
SI Unit for Mass - CORRECT ANSWER-Kilogram is the standard mass unit.
Gas Processing Proportions - CORRECT ANSWER-Gas from wells A, B, C in 4:7:5
ratio.
Equilateral Triangle Area - CORRECT ANSWER-Area calculated using side length
formula.
Multiplier in Equations - CORRECT ANSWER-Number that increases another
number in multiplication.
Triangle Area Formula - CORRECT ANSWER-Area = 0.5 * base * height.
Rectangular Tank Volume - CORRECT ANSWER-Volume = length × width × height.
,BCIT Power Engineering Exam Questions And
Answers 2025/2026
Triangle Side Area Calculation - CORRECT ANSWER-Area determined using Heron's
formula.
Oil Remaining Percentage - CORRECT ANSWER-Percentage calculated from total
minus removed.
Cross Multiplication Method - CORRECT ANSWER-Technique to solve equations
involving fractions.
Pulley Speed Relation - CORRECT ANSWER-Smaller pulleys run faster than larger
ones.
Dam Measurement - CORRECT ANSWER-One dam equals 0.1 meters.
Lead Ball Mass Calculation - CORRECT ANSWER-Mass derived from volume and
density.
Adding Fractions - CORRECT ANSWER-Combine fractions to find total value.
Parallelograms - CORRECT ANSWER-Plane figures like squares and rectangles.
Volume of Lead Ball - CORRECT ANSWER-Volume = (4/3)πr³ for sphere.
,BCIT Power Engineering Exam Questions And
Answers 2025/2026
Percentage Calculation - CORRECT ANSWER-(Part/Whole) × 100 for percentage.
Area of Triangle - CORRECT ANSWER-Calculated using sides with Heron's formula.
Mechanical Advantage - CORRECT ANSWER-Ratio of output to input forces.
Velocity Ratio - CORRECT ANSWER-Ratio of speeds in connected pulleys.
Cubic Metre of Lead - CORRECT ANSWER-Density used to find mass of lead.
Rectangle - CORRECT ANSWER-A quadrilateral with opposite sides equal.
Rhomboid - CORRECT ANSWER-A parallelogram with adjacent sides unequal.
Rhombus - CORRECT ANSWER-A parallelogram with all sides equal.
Cubic meter - CORRECT ANSWER-Volume unit equal to 1000 liters.
Volume of a tank - CORRECT ANSWER-Measured in cubic meters or liters.
, BCIT Power Engineering Exam Questions And
Answers 2025/2026
Percentage decrease - CORRECT ANSWER-Reduction expressed as a fraction of
original.
Area of a rectangle - CORRECT ANSWER-Length multiplied by width.
Final velocity formula - CORRECT ANSWER-V = u + at, solving for t.
Pressure conversion factor - CORRECT ANSWER-Multiply psi by 6.895 for kPa.
Employee percentage decrease - CORRECT ANSWER-(Employees lost / original) x
100.
Multiplicand - CORRECT ANSWER-The number being multiplied in an equation.
Hemispherical head - CORRECT ANSWER-Half-sphere shape used in boiler design.
Cubic decimeter - CORRECT ANSWER-Equivalent to 1 liter in volume.
Cubic centimeter - CORRECT ANSWER-1/1000 of a liter, volume unit.
Area of insulation - CORRECT ANSWER-Surface area needing coverage, measured
in m².
Answers 2025/2026
Boiler Drum - CORRECT ANSWER-Cylindrical vessel for steam generation.
Insulation Area - CORRECT ANSWER-Surface area needing thermal insulation.
Proper Fractions - CORRECT ANSWER-Fractions with numerator smaller than
denominator.
SI Unit for Mass - CORRECT ANSWER-Kilogram is the standard mass unit.
Gas Processing Proportions - CORRECT ANSWER-Gas from wells A, B, C in 4:7:5
ratio.
Equilateral Triangle Area - CORRECT ANSWER-Area calculated using side length
formula.
Multiplier in Equations - CORRECT ANSWER-Number that increases another
number in multiplication.
Triangle Area Formula - CORRECT ANSWER-Area = 0.5 * base * height.
Rectangular Tank Volume - CORRECT ANSWER-Volume = length × width × height.
,BCIT Power Engineering Exam Questions And
Answers 2025/2026
Triangle Side Area Calculation - CORRECT ANSWER-Area determined using Heron's
formula.
Oil Remaining Percentage - CORRECT ANSWER-Percentage calculated from total
minus removed.
Cross Multiplication Method - CORRECT ANSWER-Technique to solve equations
involving fractions.
Pulley Speed Relation - CORRECT ANSWER-Smaller pulleys run faster than larger
ones.
Dam Measurement - CORRECT ANSWER-One dam equals 0.1 meters.
Lead Ball Mass Calculation - CORRECT ANSWER-Mass derived from volume and
density.
Adding Fractions - CORRECT ANSWER-Combine fractions to find total value.
Parallelograms - CORRECT ANSWER-Plane figures like squares and rectangles.
Volume of Lead Ball - CORRECT ANSWER-Volume = (4/3)πr³ for sphere.
,BCIT Power Engineering Exam Questions And
Answers 2025/2026
Percentage Calculation - CORRECT ANSWER-(Part/Whole) × 100 for percentage.
Area of Triangle - CORRECT ANSWER-Calculated using sides with Heron's formula.
Mechanical Advantage - CORRECT ANSWER-Ratio of output to input forces.
Velocity Ratio - CORRECT ANSWER-Ratio of speeds in connected pulleys.
Cubic Metre of Lead - CORRECT ANSWER-Density used to find mass of lead.
Rectangle - CORRECT ANSWER-A quadrilateral with opposite sides equal.
Rhomboid - CORRECT ANSWER-A parallelogram with adjacent sides unequal.
Rhombus - CORRECT ANSWER-A parallelogram with all sides equal.
Cubic meter - CORRECT ANSWER-Volume unit equal to 1000 liters.
Volume of a tank - CORRECT ANSWER-Measured in cubic meters or liters.
, BCIT Power Engineering Exam Questions And
Answers 2025/2026
Percentage decrease - CORRECT ANSWER-Reduction expressed as a fraction of
original.
Area of a rectangle - CORRECT ANSWER-Length multiplied by width.
Final velocity formula - CORRECT ANSWER-V = u + at, solving for t.
Pressure conversion factor - CORRECT ANSWER-Multiply psi by 6.895 for kPa.
Employee percentage decrease - CORRECT ANSWER-(Employees lost / original) x
100.
Multiplicand - CORRECT ANSWER-The number being multiplied in an equation.
Hemispherical head - CORRECT ANSWER-Half-sphere shape used in boiler design.
Cubic decimeter - CORRECT ANSWER-Equivalent to 1 liter in volume.
Cubic centimeter - CORRECT ANSWER-1/1000 of a liter, volume unit.
Area of insulation - CORRECT ANSWER-Surface area needing coverage, measured
in m².