Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 16 pages
Exam (elaborations)

ACI CONCRETE FINAL PAPER UPDATED QUESTIONS VERIFIED COMPLETE ANSWERS 100 PERCENT CORRECT

Document preview thumbnail
Preview 3 out of 16 pages

ACI CONCRETE FINAL PAPER UPDATED QUESTIONS VERIFIED COMPLETE ANSWERS 100 PERCENT CORRECT

Content preview

ACI CONCRETE FINAL PAPER UPDATED
QUESTIONS VERIFIED COMPLETE
ANSWERS 100 PERCENT CORRECT

◉ edging
Answer: (Ch. 7, #12) Use a pointed trowel with a vertical sawing
motion to loosen concrete from the side form before _______.


◉ flat; tilted up
Answer: (Ch. 7, #13) An edger is placed _____ on the concrete surface
and then _______ ____ slightly in the direction the tool is moved.


◉ False (edging should be started about 2-3 ft *away* from the
corner. Too much pressure can cause a downturn at the corner.)
Answer: (Ch. 7, #14) True or False: When edging, start at the corner
of the slab and apply maximum pressure to ensure that corners will
not chip or spall.


◉ True
Answer: (Ch. 7, #15) True or False: Edging and jointing is not
required on most floors and should not be done unless specified.

,◉ is occasionally required for interior flatwork
Answer: (Ch. 7, #16) A fine broom finish:


◉ Embed large aggregate particles beneath the surface mortar layer;
remove slight humps to produce a plane, level surface; compact and
further consolidate the surface in preparation for other finishing
Answer: (Ch. 7, #17) After the waiting period, floating is done to:


◉ bleed water; 1/4
Answer: (Ch. 7, #18) Concrete is ready for floating when the ________
________ sheen is gone and the finisher can walk on the slab leaving
only about a ____ inch deep footprint.


◉ True
Answer: (Ch. 7, #19) True or False: While machine floating, if the
machine digs in or disrupts the level of the surface, stop floating and
wait until the concrete surface is stiffer.


◉ False (If concrete is setting slowly, floating should be done as late
as possible(when a finisher's footprint is barely perceptible)).
Answer: (Ch. 7, #20) True or False: If concrete is setting slowly,
floating should be done when the finisher's footprint is 1/2 in. or
more.

, ◉ floating; floated
Answer: (Ch. 7, #21) Troweling follows immediately after _________,
and no troweling should ever be done unless the surface has first
been _________.


◉ True
Answer: (Ch. 7, #22) True or False: When hand finishing, finishers
usually float and then steel trowel an area before moving their knee
boards.


◉ tilting the trowel blade too much or too soon
Answer: (Ch. 7, #23) Chatter or washboard marks on a finished
surface are caused by:


◉ perpendicular
Answer: (Ch. 7, #24) The direction of the first machine floating pass
should be __________ to the direction of the last finishing procedure.


◉ creates waves that grow larger with repeated passes of the
machine.
Answer: (Ch. 7, #25) Machine floating or troweling of slabs is
typically done in two directions-- parallel and perpendicular to the
side forms. Floating or troweling in only one direction:

Document information

Uploaded on
July 22, 2026
Number of pages
16
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$15.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TopGradeInsider
4.2
(10)
Sold
136
Followers
1
Items
50401
Last sold
3 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions