This is the eighth and final lesson exam for the Cost Estimating (B06V) course at Ashworth College, assessing knowledge from Chapters 16 through 21. While the specific content of these chapters in this course cannot be definitively determined from the available search results, the B06V course focuses on cost estimating for building construction projects, including estimating labor, materials, equipment, and subcontractor costs, and calculating project profit . The final exam would likely be comprehensive or cover the concluding chapters of the course curriculum.

Vista previa del contenido

Ashworth College B06V Lesson 8 Exam Chap 16 - 21
Question 1 points
To determine if a plumbing subcontractor's bid is reasonable, the estimator should:
Question options:
have complete knowledge of the American Standard National Plumbing Code.
perform an independent detailed estimate including labor, materials, and equipment
for the plumbing work.
keep a complete file of all costs for reference.
average the high and low bid received.
Question
points
2
When preparing a plumbing finishes checklist, an estimator for the prime contractor should
include all of the following EXCEPT:
Question options:
<p>bath tubs.</p>
<p>water closets.</p>
<p>sewage lines.</p>
<p>drinking fountains and service sinks.</p>
Question
points
3
Wetwall construction consists of the following EXCEPT:
Question options:
lath.
wallboards.
plaster.
stucco.
Question
points
4
In a single contract arrangement:
Question options:
an electrical subcontractor will generally submit a check bid to the prime contractor.
a single prime contractor is responsible for the electric work.
the electric subcontractor is responsible for his work directly to the owner.
the electrical subcontractor's overhead and profit are included in the prime
contractor's overhead and profit.
Question
points
5
When estimating lath for wetwall construction, the estimator should:
Question options:
takeoff all lath in square feet.
specify diamond metal lath, which is ideal as a plaster base.
assume a 10% waste factor for all types of lath.
check a subcontractor's bid to ensure that it calls for the same lath as the contract
documents.
Question
points
6

, All of the following are underground utilities coordination requirements EXCEPT:
Question options:
floor drains.
utilities location, and size.
excavation specifics and by whom.
utilities depth and type.
Question
points
7
When considering the supporting system for drywall and wetwall construction:
Question options:
supporting systems should be installed in accordance with the manufacturer's
recommendations regardless of the contract specifications since the manufacturer is
guaranteeing the work.
if the specifications by the architect/engineer are stricter than the manufacturer's, it is
the architect/engineer's specifications that must be followed.
if the specifications by the architect/engineer are stricter than the manufacturer's, it is
the manufacturer's specifications that must be followed.
if the specifications by the architect/engineer are less strict than the manufacturer's
recommendations, the architect/engineer has relaxed the requirements on the project.
Follow his/her specifications.
Question
points
8
A typical material used in drywall construction is:
Question options:
vinyl-coated plywood.
lath.
stucco.
plaster.
Question
points
9
A suspended ceiling system:
Question options:
has limited options and is classified as an exposed grid system.
may be required if the supporting construction is not properly aligned and true or if
lower ceiling heights are required.
does not require lath to support the wetwall construction.
allows for many things including recessed lighting, acoustical control, and fire rating,
but cannot be used as a substitute for air distribution.
Question
points
10
Radiant-heat lath attributes are all of the following EXCEPT:
Question options:
perforated.
available in 48" widths and ½" to 5/8" thickness.
increase resistance to heat deterioration.
improves heat emission of electric cables.

Información del documento

Subido en
20 de julio de 2026
Número de páginas
10
Escrito en
2025/2026
Tipo
Examen
Contiene
Preguntas y respuestas
$22.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
grade_bender
3.9
(148)
Vendido
1075
Seguidores
958
Artículos
2262
Última venta
1 día hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes