Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 38 pages
Exam (elaborations)

LADOTD PCC Plant Inspection Exam Questions and Correct Answers 2026

Document preview thumbnail
Preview 4 out of 38 pages

This document contains a comprehensive collection of LADOTD PCC Plant Inspection exam questions and correct answers covering Portland Cement Concrete (PCC) production, plant operations, quality control, and inspection procedures. It includes topics such as mix design, batching, aggregate testing, moisture and gradation testing, admixtures, sampling procedures, slump and air testing, plant certification, DOTD specifications, concrete materials, and quality assurance requirements. The material is presented in a question-and-answer format, making it an effective study guide for exam preparation, certification, and review.

Content preview

LADOTD PCC Plant Inspection Exam
Questions And Correct Answers


What does concrete primarily consist of?

cement, aggregates, and water




PCC produced and delivered for use in the building of roads and structures must
conform to...

Sections 601, 805, & 901 of the standard specs




Concrete produced for precast units shall conform to what sections of the
standard specs?

901, 1006, and 1016




Concrete produced and delivered for use in the construction of curbs, gutters,
medians, and catchbasins

minor structural concrete

,The constant monitoring by the contractor of equipment, materials, processes,
and making the necessary adjustments to ensure that concrete mixtures
produced and placed are uniform, are within control limits, and meet spec
requirements

quality control




DOTD specs can be overridden by...

supplemental specs, plans, and plan changes/special agreements




How many categories of concrete are there?

2




Concrete mixtures shall be produced in accordance with requirements as
identified on...

the project contract, the project plans, and Table 1, Master Proportion Table




Before any concrete is placed on a project, what should the contractor submit
to the department for acceptance?

a proposed mix design

,Who is responsible for designing the concrete mixture, taking samples, and
performing tests necessary for control of the concrete mixture within spec
requirements?

the contractor's certified concrete technician




The DOTD Inspector is required to visit the contractor's plant...

daily when the plant is operating and producing concrete for a DOTD project




Acceptance and sampling testing are performed by or under the direction of
whom?

the DOTD certifies inspector




Who should the contractor's proposed mix design must be submitted to for
acceptance?

district laboratory engineer




The department's publication which lists products for which source approval
has been granted

Qualified Products List

, The minimum sampling frequency by section and material is delineated in the...

Materials Sampling Manual




A schedule which outlines the minimum sampling and testing frequencies for all
materials to be used on a project

sampling plan




The type of concrete plant referred to as ready mix

batch plant




The type of plant that uses a truck mixers to completely mix the concrete
components at the plant before transport to the jobsite

batch plant




The type of plant that uses a stationary mixer at the plant site to mix the
concrete components and transports the mixture to the jobsite in truck mixers
or non agitator/haul trucks

Central mix plant

Document information

Uploaded on
July 20, 2026
Number of pages
38
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$11.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Hosmerit
4.8
(256)
Sold
402
Followers
44
Items
4549
Last sold
5 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions