PYC4814 Assignment 03 2026 (Answer Guide)
VERIFIED AND CERTIFIED ANSWERS. WRITTEN IN REQUIRED FORMAT AND WITHIN
GIVEN GUIDELINES. IT IS GOOD TO USE AS A GUIDE AND FOR REFERENCE, NEVER
PLAGARIZE. Thank you and success in your academics.
UNISA, 2026
1. Identify a Problem in the Community
A significant problem in the rural community is the limited and unreliable access to clean
and safe water. Many households depend on distant water sources or alternative
sources that may not always provide sufficient or safe water for domestic use.
2. Describe a Possible Solution
A possible solution that would likely satisfy the most powerful people in the community
would be the construction of a central borehole and a large water-storage facility,
supported by a network of communal water points. Local political and traditional leaders
may favour this solution because it represents a visible development project that can
demonstrate their commitment to improving the lives of community members. A
centralised water project could also provide a relatively straightforward way for leaders
and local authorities to organise the distribution of water and demonstrate measurable
development progress. The project could be funded through cooperation between local
government and other development organisations, with community leaders overseeing
its implementation. However, this solution may primarily reflect the priorities of people
with greater authority and influence in the community, and it may not automatically
address the different needs of all residents.
3. Consider How Diversity Affects Possible Solutions
The proposed solution could be improved by recognising that the community consists of
different groups whose experiences and needs are not the same. Women and girls, who
may be responsible for collecting water, could benefit from water points located closer