✔✔The test pressure applied after a repair is completed on a vessel built to 2001 ed of
the ASME code sec 8 shall be - ✔✔1.4 MAWP X
✔✔Persons performing the external inspection in accordance with API 510 - ✔✔Shall
be qualified with the appropriate training
✔✔Hot cracking is defined as - ✔✔Cracking formed at temperatures near the
completion of weld solidification
✔✔API standard 510 - ✔✔Recognizes the application of fitness for service and risk
based inspection
✔✔For vessels with external insulation in good condition - ✔✔CUI damage may still be
occurring
✔✔In the FCAW welding electrode identification system EXXT-X the last X refers to -
✔✔Coating operating characteristics
✔✔One advantage of using the spray transfer mode when performing GMAW welding is
- ✔✔Spatter is negligible
✔✔An imperfection whose type or size exceeds the applicable acceptance criteria is
referred to as - ✔✔A defect
✔✔When developing an inspection plan equipment shall be evaluated based on -
✔✔Present or possible types of damage mechanisms
✔✔External inspection intervals for equipment in non continuous service are - ✔✔The
same as for vessels in continuous service
✔✔Where can detailed information concerning common damage mechanisms be found
- ✔✔API RP 571
✔✔In radiographic examination penetrameters are used to - ✔✔Determine the required
density is achieved
✔✔What is the definition of density of a material - ✔✔Mass per unit volume
✔✔Preferential weld corrosion shall be assessed by - ✔✔The inspector
, ✔✔According to API 510 the inspector in consultation with whom, should determine
when it is necessary to remove deposits or linings to perform adequate inspection -
✔✔The corrosion specialist
✔✔For equipment not designed for entrance by personnel - ✔✔Inspection ports shall be
opened for examination of surfaces
✔✔When developing an inspection plan for vessels that operate above 750 degrees -
✔✔A corrosion specialists shall be consulted
✔✔How does a welder get more amperage - ✔✔Increase the amperage
✔✔When installing insert plates on a pressure vessel the weld proximity to existing
welds - ✔✔Shall not be less than 2T where T is the thickness of the shell
✔✔For vessels fabricated with carbon and low alloy steel, general and local metal loss
can result from - ✔✔Naphtenic acid corrosion
✔✔Which readings taken within the area of examination of a CML shall be used to
calculate corrosion rates - ✔✔The thinnest or an average of several measurements
✔✔The primary purpose for preheating carbon and low alloy steel prior to welding is to -
✔✔Reduce the chance for delayed cracking
✔✔If the requirements of 510 are more stringent than the jurisdiction requirements -
✔✔The requirements of API 510 shall govern
✔✔The installation of a new nozzle that does not require reinforcement - ✔✔Shall be
approved by an engineer
✔✔API Publication 2201 on hot tapping and in service welding covers - ✔✔Safety
aspects
✔✔According to API 510 additional guidance on material verification programs can be
found - ✔✔API 578
✔✔What is the inspectors role regarding preheat temperature used in making welding
repairs - ✔✔The inspector should assure that the minimum preheat temperature is
measured and maintained
✔✔What are indications - ✔✔A response or evidence resulting from the application of
NDE
AND SOLUTIONS RATED A+
✔✔The test pressure applied after a repair is completed on a vessel built to 2001 ed of
the ASME code sec 8 shall be - ✔✔1.4 MAWP X
✔✔Persons performing the external inspection in accordance with API 510 - ✔✔Shall
be qualified with the appropriate training
✔✔Hot cracking is defined as - ✔✔Cracking formed at temperatures near the
completion of weld solidification
✔✔API standard 510 - ✔✔Recognizes the application of fitness for service and risk
based inspection
✔✔For vessels with external insulation in good condition - ✔✔CUI damage may still be
occurring
✔✔In the FCAW welding electrode identification system EXXT-X the last X refers to -
✔✔Coating operating characteristics
✔✔One advantage of using the spray transfer mode when performing GMAW welding is
- ✔✔Spatter is negligible
✔✔An imperfection whose type or size exceeds the applicable acceptance criteria is
referred to as - ✔✔A defect
✔✔When developing an inspection plan equipment shall be evaluated based on -
✔✔Present or possible types of damage mechanisms
✔✔External inspection intervals for equipment in non continuous service are - ✔✔The
same as for vessels in continuous service
✔✔Where can detailed information concerning common damage mechanisms be found
- ✔✔API RP 571
✔✔In radiographic examination penetrameters are used to - ✔✔Determine the required
density is achieved
✔✔What is the definition of density of a material - ✔✔Mass per unit volume
✔✔Preferential weld corrosion shall be assessed by - ✔✔The inspector
, ✔✔According to API 510 the inspector in consultation with whom, should determine
when it is necessary to remove deposits or linings to perform adequate inspection -
✔✔The corrosion specialist
✔✔For equipment not designed for entrance by personnel - ✔✔Inspection ports shall be
opened for examination of surfaces
✔✔When developing an inspection plan for vessels that operate above 750 degrees -
✔✔A corrosion specialists shall be consulted
✔✔How does a welder get more amperage - ✔✔Increase the amperage
✔✔When installing insert plates on a pressure vessel the weld proximity to existing
welds - ✔✔Shall not be less than 2T where T is the thickness of the shell
✔✔For vessels fabricated with carbon and low alloy steel, general and local metal loss
can result from - ✔✔Naphtenic acid corrosion
✔✔Which readings taken within the area of examination of a CML shall be used to
calculate corrosion rates - ✔✔The thinnest or an average of several measurements
✔✔The primary purpose for preheating carbon and low alloy steel prior to welding is to -
✔✔Reduce the chance for delayed cracking
✔✔If the requirements of 510 are more stringent than the jurisdiction requirements -
✔✔The requirements of API 510 shall govern
✔✔The installation of a new nozzle that does not require reinforcement - ✔✔Shall be
approved by an engineer
✔✔API Publication 2201 on hot tapping and in service welding covers - ✔✔Safety
aspects
✔✔According to API 510 additional guidance on material verification programs can be
found - ✔✔API 578
✔✔What is the inspectors role regarding preheat temperature used in making welding
repairs - ✔✔The inspector should assure that the minimum preheat temperature is
measured and maintained
✔✔What are indications - ✔✔A response or evidence resulting from the application of
NDE