CQM-C EXAM QUESTIONS AND ANSWERS % CORRECT
ANSWERS
The purpose of Construction Quality Management is to: answer
>>Achieve the quality established by properly developed requirements
through the combined responsibility, but seperate efforts of contractor
sad government personnel.
Construction Quality Management is the performance of tasks, which
ensure that construction is performed. answer >>According to plans
and specifications, on time, within a defined budget and a safe work
environment.
Partnering relationships are based upon: answer >>Building trust and
dedication to common goals
It is the responsibility of Quality Assurance Personnel to: answer
>>Periodically verify that the contractor’s system of control is working
effectively.
An effective contractor quality control program will: answer >>Be an
incentive for work to be done correctly the first time resulting in earlier
completion, reduced field overhead costs, and greater profits.
, CQM-C
The success or failure of all contractors is based upon: answer >>The
ability to control costs, finance work, estimate jobs, schedule the work,
and maintain effective quality control.
Quality Assurance Personnel have the responsibility to: answer
>>Require contractors to maintain the quality specified in the plans and
specifications.
Inspection is: answer >>The process by which ongoing and completed
work is examined
During the punch-out inspection of a project: answer >>Quality
Assurance Personnel must assure that the contractor prepares a punch-
list and makes corrections.
If there is a disagreement whether the contractors work complies with
the contract: answer >>The government makes the final
determination
Characteristics that describe a definable feature of work include:
answer >>Cross-referenced listings to the contractor’s construction
schedule that may have more than one definable feature under a
section of the specifications.