✔✔Layout - ✔✔Process layout works well for goods that are customizable or require
fewer tasks overall.
✔✔Layout - ✔✔The work pattern we select must allow for mass manufacturing of
products that might change from year to year and could be slightly customized.
✔✔Layout - ✔✔Process layout.
✔✔Inventory - ✔✔We need to look at the benefits and drawbacks of both a warehouse
option and a just-in-time (JIT) inventory system.
✔✔Inventory - ✔✔Materials will always be available because we can order them far in
advance, and we can order larger quantities from our suppliers.
✔✔Inventory - ✔✔Yes, if we buy larger quantities, the price per unit will likely decrease.
✔✔Inventory - ✔✔Yes, we need to consider the cost of building a warehouse, the loss
of space that would otherwise be available for production expansion, and additional
taxes on the warehouse building.
✔✔Inventory - ✔✔It will save us money because we don't have to build a warehouse or
pay taxes for another building on our property.
✔✔Inventory - ✔✔It all boils down to bottom-line numbers in the end, and the prices of
materials supplied with a J.I.T. system are usually higher.
✔✔Inventory - ✔✔The warehouse model.
✔✔Quality Control - ✔✔I agree this conversation is necessary, but I need to know more
about quality control options and their impact on Bump Up Bumpers.
✔✔Quality Control - ✔✔ISO 9000 would set a product standard for which we would be
accountable, and it would require us to establish better quality in the future through
additional goals that were set.
✔✔Quality Control - ✔✔Six Sigma is an overall quality control process that is designed
to yield nearly flawless production of 3.4 defects per million products produced.
✔✔Quality Control - ✔✔ISO 9000
✔✔ Location - ✔✔Shipping costs, Production Capacity, and Expansion opportunities.
SOLUTIONS RATED A+
✔✔Layout - ✔✔Process layout works well for goods that are customizable or require
fewer tasks overall.
✔✔Layout - ✔✔The work pattern we select must allow for mass manufacturing of
products that might change from year to year and could be slightly customized.
✔✔Layout - ✔✔Process layout.
✔✔Inventory - ✔✔We need to look at the benefits and drawbacks of both a warehouse
option and a just-in-time (JIT) inventory system.
✔✔Inventory - ✔✔Materials will always be available because we can order them far in
advance, and we can order larger quantities from our suppliers.
✔✔Inventory - ✔✔Yes, if we buy larger quantities, the price per unit will likely decrease.
✔✔Inventory - ✔✔Yes, we need to consider the cost of building a warehouse, the loss
of space that would otherwise be available for production expansion, and additional
taxes on the warehouse building.
✔✔Inventory - ✔✔It will save us money because we don't have to build a warehouse or
pay taxes for another building on our property.
✔✔Inventory - ✔✔It all boils down to bottom-line numbers in the end, and the prices of
materials supplied with a J.I.T. system are usually higher.
✔✔Inventory - ✔✔The warehouse model.
✔✔Quality Control - ✔✔I agree this conversation is necessary, but I need to know more
about quality control options and their impact on Bump Up Bumpers.
✔✔Quality Control - ✔✔ISO 9000 would set a product standard for which we would be
accountable, and it would require us to establish better quality in the future through
additional goals that were set.
✔✔Quality Control - ✔✔Six Sigma is an overall quality control process that is designed
to yield nearly flawless production of 3.4 defects per million products produced.
✔✔Quality Control - ✔✔ISO 9000
✔✔ Location - ✔✔Shipping costs, Production Capacity, and Expansion opportunities.