Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 78 pages
Exam (elaborations)

TEXAS ON-SITE SEWAGE FACILITY (OSSF) MAINTENANCE PROVIDER LICENSING EXAM COMPLETE QUESTIONS AND DETAILED SOLUTIONS LATEST UPDATE 2026

Document preview thumbnail
Preview 4 out of 78 pages

Master the Texas OSSF Maintenance Provider Exam with this comprehensive 300-question study guide featuring actual exam questions and verified answers. Covers all essential topics including Texas Health and Safety Code Chapter 366, 30 TAC Chapter 285 regulations, Aerobic Treatment Units (ATUs), spray and drip irrigation systems, pumps, alarms, control panels, disinfection methods, chlorine and UV systems, confined space safety, PPE requirements, maintenance reporting, and regulatory compliance. Each question includes detailed rationales to help you understand the reasoning behind correct answers, making this the ultimate Texas OSSF exam preparation resource. Updated for 2026 with the most recent exam content, this guide ensures you're fully prepared to pass your Texas On-Site Sewage Facility Maintenance Provider certification on your first attempt. Perfect for OSSF maintenance providers, septic system technicians, environmental health specialists, and wastewater professionals seeking Texas licensure.

Content preview

TEXAS ON-SITE SEWAGE FACILITY (OSSF)
MAINTENANCE PROVIDER LICENSING EXAM COMPLETE
QUESTIONS AND DETAILED SOLUTIONS
LATEST UPDATE 2026

EXAM COVERAGE SUMMARY:
1. Texas Health and Safety Code and Texas Administrative Code (30 TAC Chapter 285)
2. Roles, responsibilities, and ethics of licensed OSSF Maintenance Providers
3. Types of On-Site Sewage Facility systems and treatment technologies
4. Aerobic Treatment Units (ATUs), components, and operating principles
5. Spray distribution systems, drip irrigation, low-pressure dosing, and disposal methods
6. Pumps, alarms, timers, floats, control panels, and electrical safety
7. Routine inspection procedures, maintenance schedules, and troubleshooting
8. Effluent quality, disinfection methods, chlorine tablets, UV systems, and sampling requirements
9. Safety procedures, confined space awareness, personal protective equipment, and environmental
protection
10. Maintenance reporting, homeowner education, documentation, and regulatory compliance



SECTION 1: TEXAS HEALTH AND SAFETY CODE AND TEXAS ADMINISTRATIVE CODE
(30 TAC CHAPTER 285)
Questions 1–30
Q1. Which Texas Administrative Code (TAC) chapter contains the primary
regulations for On-Site Sewage Facility Systems (OSSFs) in Texas?
A) Chapter 220
B) Chapter 285
C) Chapter 302
D) Chapter 310
**Correct Answer: B**
Rationale: 30 TAC Chapter 285 specifically governs the design, installation,
operation, and maintenance of OSSF systems in Texas.

Q2. The Texas Health and Safety Code chapter that addresses on-site sewage
disposal systems is:
A) Chapter 341


1

,B) Chapter 366
C) Chapter 285
D) Chapter 401
**Correct Answer: B**
Rationale: Texas Health and Safety Code Chapter 366 establishes the statutory
framework for on-site sewage facilities.

Q3. Under 30 TAC §285.7(d), which type of OSSF system requires a permit from
the TCEQ rather than a local permitting authority?
A) All aerobic treatment systems
B) Systems with flow greater than 5,000 gallons per day
C) All conventional septic systems
D) Systems serving single-family homes only
**Correct Answer: B**
Rationale: Any OSSF designed to handle flow greater than 5,000 gallons per day
requires a direct TCEQ permit.

Q4. According to 30 TAC Chapter 285, who is authorized to enforce OSSF
regulations in Texas?
A) TCEQ only
B) Local permitting authorities (LPAs) and TCEQ
C) The Texas Department of Health only
D) Local police departments
**Correct Answer: B**
Rationale: Both TCEQ and designated LPAs share enforcement authority.

Q5. The requirement for a maintenance provider to be licensed is found in which
section of the Texas Health and Safety Code?
A) Section 366.025
B) Section 366.002
C) Section 366.051
D) Section 366.100
**Correct Answer: A**

2

,Rationale: Health and Safety Code §366.025 establishes licensing requirements
for OSSF maintenance providers.

Q6. Under 30 TAC §285.4, "Aerobic Treatment Unit" (ATU) is defined as:
A) Any system that uses only gravity for treatment
B) A system that uses mechanical components to introduce oxygen into the
wastewater
C) A system that uses only chemical disinfection
D) Any system that does not require a drain field
**Correct Answer: B**
Rationale: The definition specifies that ATUs introduce oxygen (air) mechanically
to promote aerobic bacterial treatment.

Q7. The minimum separation distance between an OSSF disposal field and a
private water well is:
A) 25 feet
B) 50 feet
C) 75 feet
D) 100 feet
**Correct Answer: D**
Rationale: 30 TAC §285.91 requires a 100-foot minimum separation between
disposal fields and private water wells.

Q8. The maximum daily flow used for sizing an OSSF for a three-bedroom single-
family home is:
A) 300 gallons per day
B) 400 gallons per day
C) 450 gallons per day
D) 500 gallons per day
**Correct Answer: C**
Rationale: Standard flow is 150 gallons per bedroom per day (3 x 150 = 450 GPD).




3

, Q9. The rule governing "setbacks" and "minimum separation distances" in Texas is
found in:
A) 30 TAC §285.91
B) 30 TAC §285.30
C) 30 TAC §285.7
D) 30 TAC §285.200
**Correct Answer: A**
Rationale: 30 TAC §285.91 contains the comprehensive setback and separation
distance requirements.

Q10. Which local entity can be designated as a Local Permitting Authority (LPA)
for OSSF?
A) A county health department
B) A city health department
C) A river authority
D) All of the above
**Correct Answer: D**
Rationale: All three can be designated as LPAs under TCEQ rules.

Q11. The TCEQ requires that all OSSF maintenance providers have liability
insurance with a minimum coverage of:
A) $50,000
B) $100,000
C) $300,000
D) No specific amount specified in state rule but strongly recommended
**Correct Answer: D**
Rationale: While not explicitly stated in 30 TAC, professional liability insurance is
strongly recommended and required by most LPAs.

Q12. An OSSF system that is not maintained according to the approved
maintenance schedule may be considered:
A) Non-compliant
B) A nuisance

4

Document information

Uploaded on
July 18, 2026
Number of pages
78
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$26.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
PrepMaster
4.7
(313)
Sold
363
Followers
21
Items
3228
Last sold
16 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions