,Question 1
A UST system with impressed current cathodic protection (ICCP) shows a rectifier output of 6
volts and 2 amps. The technician measures a structure-to-electrolyte potential of -0.75 V (CSE) at
the far end of the tank. According to California regulations, what is the most appropriate
corrective action?
A) Increase rectifier voltage to achieve -0.85 V or more negative at the far end.
B) Decrease rectifier voltage to prevent overprotection and coating disbondment.
C) Replace the reference electrode because -0.75 V indicates a faulty reading.
D) No action needed because -0.75 V is within the acceptable range for ICCP.
Answer: A) Increase rectifier voltage to achieve -0.85 V or more negative at the far end.
Explanation: California requires a minimum of -0.85 V (CSE) polarized potential for cathodic
protection. -0.75 V indicates insufficient protection, so increasing rectifier output is
needed. Overprotection is not a concern here, and the reading is valid.
Question 2
During a 3-year line tightness test on a pressurized piping system, the test results show a leak rate
of 0.08 gph. The system operates at 40 psi. Which action is required per California UST
regulations?
A) Immediately remove the piping from service and report a suspected release.
B) Perform a precision test within 30 days to confirm the leak rate.
C) No action because the leak rate is below the 0.1 gph threshold.
D) Replace the piping because any detectable leak is unacceptable.
Answer: A) Immediately remove the piping from service and report a suspected release.
Explanation: For pressurized piping, any leak detection test failure ("e0.08 gph) requires immediate
shutdown and reporting. The 0.1 gph threshold applies only to suction systems.
Precision testing is not an option after a failure.
Page 2
,Question 3
A double-walled fiberglass tank has a brine interstitial monitoring system. The sensor alarms
indicate a conductivity change of 15% above baseline. The technician finds no visible leaks in the
sump. What is the most likely cause and next step?
A) Water intrusion into the interstice due to a breach in the outer wall; perform a hydrostatic test.
B) Normal fluctuation; reset the sensor and recalibrate.
C) Product leakage from the inner wall; conduct a tank tightness test.
D) Sensor malfunction; replace the probe and monitor for 30 days.
Answer: C) Product leakage from the inner wall; conduct a tank tightness test.
Explanation: A conductivity increase in brine indicates product leakage (hydrocarbons increase
conductivity). Water intrusion would dilute brine and decrease conductivity. The inner
wall is likely leaking; a tank tightness test is required. Resetting or replacing the sensor
would not address the leak.
Question 4
Which of the following scenarios requires submitting a 'Release Detection Monitoring Report' to
the California State Water Resources Control Board within 30 days?
A) A monthly monitoring report shows a 0.2 gph leak from a suction system.
B) An automatic tank gauge (ATG) detects a sudden loss of 0.5 inches of product in 24 hours.
C) A secondary containment sump sensor alarms due to standing water after heavy rain.
D) A line leak detector fails a function test and is repaired within 7 days.
Answer: B) An automatic tank gauge (ATG) detects a sudden loss of 0.5 inches of product in 24
hours.
Explanation: A sudden product loss >0.2 gph or >0.5 inches in 24 hours indicates a suspected release
requiring immediate reporting. Suction system leaks below threshold (0.1 gph) do not
require report; water in sump is not a release; failed detector repair is routine
maintenance.
Page 3
, Question 5
A technician is evaluating a UST site with a 10,000-gallon gasoline tank. The overfill prevention
equipment includes a drop tube with a flapper valve and an automatic shutoff device. During a
delivery, the shutoff device fails to activate. What is the maximum allowable delivery rate before
the flapper valve must close?
A) 5 gpm
B) 10 gpm
C) 12 gpm
D) 25 gpm
Answer: B) 10 gpm
Explanation: California requires that when an automatic shutoff device fails, the drop tube flapper
valve must close at a flow rate not exceeding 10 gpm to prevent overfill. The 12 gpm
and 25 gpm are not allowed; 5 gpm is too restrictive.
Question 6
A technician performing a 30-day monitoring check on a pressurized line finds that the mechanical
line leak detector (LLD) does not trip during the test. The line is 150 ft long with 2-inch diameter
pipe. What is the minimum flow rate the LLD must detect to meet California requirements?
A) 3.0 gph at 10 psi
B) 3.0 gph at 5 psi
C) 0.2 gph at line pressure
D) 0.1 gph at 50 psi
Answer: A) 3.0 gph at 10 psi
Explanation: California requires mechanical LLDs to detect a leak of 3.0 gph at 10 psi (or
equivalent). The 0.2 gph and 0.1 gph thresholds apply to automatic line leak detectors or
precision tests, not mechanical LLDs. 3.0 gph at 5 psi is insufficient.
Page 4