||ACCURATE EXAM APPROVED QUESTIONS AND
CORRECT DETAILED ANSWERS WITH RATIONALES
(CORRECT VERIFIED SOLUTIONS) CURRENTLY
UPDATED VERSION 2026 EDITION |GUARANTE
All customer orders that have not shipped. Includes past due, current,
and future orders are:
-Backlog***
-Backorder
-Backwater
-None of the above
Tires used in the assembly of a car would be an example of what type of
"demand"?
-Dependent***
-Convergent
-Divergent
-Independent
Tires used for replacement items for your car would be an example of
what type of "demand"?
-Dependent
-Convergent
-Divergent
-Independent***
,Which one of the following statements is correct about forecasting?
-Forecasts are usually correct
-Long-term forecasts are more accurate than short-term forecasts
-Aggregate forecasts are less accurate than disaggregate forecasts
-None of the above are correct statements about forecasts***
Addresses only critical work-centers, may ignore work in process or even
on-hand inventory, may not consider job sequence effect, and may not
consider job set-up time dependency, are limitations of:
-Rough-cut Capacity Planning (RCCP)***
-Load Requirements Profile (LRP)
-Detailed Routing Execution (DRE)
-Rough-cut Load Profile Detailed Execution Planning (RCLPDEP)
Which of the following is a benefit of effective sourcing decisions?
-Economies of scale can be achieved if orders are aggregated
-Efficient procurement transactions can significantly reduce the overall of
purchasing
-Design collaboration can result in products that are easier to
manufacture and distribute, resulting in lower overall costs***
-None of the above
, The meeting of forecasted demand, while minimizing cost over the
planning horizon, is the objective of:
-Cross planning
-Aggregate planning***
-Vendor managed planning
-Moving average planning
Items such as "Disaggregation breaks the plan down into greater detail"
and "Disaggregation results in a master production schedule (MPS)" or
"Decisions are made at a product family (not SKU) level" are
characteristics of:
-Cross planning
-Aggregate planning***
-Vendor managed planning
-Moving average planning
Which aggregate planning strategy synchronizes the production rate
with demand by varying machine capacity or hiring and laying off
workers as the demand rate varies?
-Level strategy
-Chase strategy***
-Smoothing strategy
-Optimization strategy