EAP/FLSD Questions with 100% Correct
Answers
how many stair ways
8
what is primary and secondary
primary B 1 to roof secondary A 1 & 3 to 45
which one leads to fire pump room
F B4-1 &3
how many elevators
25
how many escalators
9
how many frights
5 S1 B3-10 floor, S2 B3-B4 and 8-0 T4 B3-1, F1, F2, P1 and P2 B3-1
fright under key
Z bank 1-2 and 5-45
building population in day and night
2089 and 60
who is engineer
Dante Landi
, who is the fire safety director
Alex Banks
Who is the managing agent
Jeff Ram
sky lobby
8 and 24 floor
HVAC Zones
Package unites for each floor
Building information
42 stories, 4 floors below (sub leval), height 676, width 200 x 220, construction steel frame
over metal decking. No trust roof, floors no
Horizontal connections Passage/ utility pipe chase
Electrical riser at B1-44th floor and fresh air vents at 5th floor to 23rd floor
roof setback
5th, 36th and 45th floor
Does the building have purge
yes manually
engineers on site
yes
locations of mechanical rooms
Answers
how many stair ways
8
what is primary and secondary
primary B 1 to roof secondary A 1 & 3 to 45
which one leads to fire pump room
F B4-1 &3
how many elevators
25
how many escalators
9
how many frights
5 S1 B3-10 floor, S2 B3-B4 and 8-0 T4 B3-1, F1, F2, P1 and P2 B3-1
fright under key
Z bank 1-2 and 5-45
building population in day and night
2089 and 60
who is engineer
Dante Landi
, who is the fire safety director
Alex Banks
Who is the managing agent
Jeff Ram
sky lobby
8 and 24 floor
HVAC Zones
Package unites for each floor
Building information
42 stories, 4 floors below (sub leval), height 676, width 200 x 220, construction steel frame
over metal decking. No trust roof, floors no
Horizontal connections Passage/ utility pipe chase
Electrical riser at B1-44th floor and fresh air vents at 5th floor to 23rd floor
roof setback
5th, 36th and 45th floor
Does the building have purge
yes manually
engineers on site
yes
locations of mechanical rooms