FLSD Onsite Questions with 100% Correct
Answers
Construction Class
Type 1B/ Class 1-c: 2 Hr Protected
Occupancy
Hotel/Motel
Number of Rooms
75
Building Population, Day
78
Building Population, Night
124
Building Population, Total
126
Type of Construction
Steel and Concrete
Roof Setback Levels
FL2
Exit Stairways, A
Cellar to FL1 and FL1 to roof
, Exit Stairways, B
Cellar to Roof
Reentry Floors
All Stairs on all Floors
Roof access stairwells
A and B
Elevators
Bank letter, A and to Cellar to FL1o
Ventilation
Guests rooms are heated and cooled by individual wall units. Corridors Cellar to FL10 and
Lobby on FL 1 served by HVAC on the roof
Smoke Management System
Yes
Purge Capability
Manual
Locations of Mechanical Rooms
FL 10
ututilies, Natural gas
yes
electrical serivce
Answers
Construction Class
Type 1B/ Class 1-c: 2 Hr Protected
Occupancy
Hotel/Motel
Number of Rooms
75
Building Population, Day
78
Building Population, Night
124
Building Population, Total
126
Type of Construction
Steel and Concrete
Roof Setback Levels
FL2
Exit Stairways, A
Cellar to FL1 and FL1 to roof
, Exit Stairways, B
Cellar to Roof
Reentry Floors
All Stairs on all Floors
Roof access stairwells
A and B
Elevators
Bank letter, A and to Cellar to FL1o
Ventilation
Guests rooms are heated and cooled by individual wall units. Corridors Cellar to FL10 and
Lobby on FL 1 served by HVAC on the roof
Smoke Management System
Yes
Purge Capability
Manual
Locations of Mechanical Rooms
FL 10
ututilies, Natural gas
yes
electrical serivce