Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 13 pages
Exam (elaborations)

OPMA EXAM 2 | STUDY GUIDE, MCQS, PRACTICE QUESTIONS AND OPERATIONS MANAGEMENT EXAM REVIEW | 2026/2027

Document preview thumbnail
Preview 2 out of 13 pages

OPMA EXAM 2 | STUDY GUIDE, MCQS, PRACTICE QUESTIONS AND OPERATIONS MANAGEMENT EXAM REVIEW | 2026/2027

Content preview

OPMA EXAM 2 | STUDY GUIDE, MCQS, PRACTICE QUESTIONS AND OPERATIONS
MANAGEMENT EXAM REVIEW | 2026/2027



A manufacturing shop is designed to operate most efficiently at an output of 550 units per day.
In the past month the plant averaged 490 units per day.

What was their capacity utilization rate last month? - ANS ✔✔Capacity utilization rate

89.1 ± 0.1



A company has a factory that is designed so that it is most efficient (average unit cost is
minimized) when producing 15,000 units of output each month. However, it has an absolute
maximum output capability of 17,250 units per month, and can produce as little as 7,000 units
per month without corporate headquarters shifting production to another plant. If the factory
produces 10,925 units in October, what is the capacity utilization rate in October for this
factory? - ANS ✔✔Capacity utilization rate

72.8 ± 0.1



Hoosier Manufacturing operates a production shop that is designed to have the lowest unit
production cost at an output rate of 100 units per hour. In the month of July, the company
operated the production line for a total of 175 hours and produced 16,900 units of output.



What was its capacity utilization rate for the month? - ANS ✔✔Capacity utilization rate

96.6 ± 0.1%



AlwaysRain Irrigation, Inc., would like to determine capacity requirements for the next four
years. Currently two production lines are in place for making bronze and plastic sprinklers.
Three types of sprinklers are available in both bronze and plastic: 90-degree nozzle sprinklers,
180-degree nozzle sprinklers, and 360-degree nozzle sprinklers. Management has forecast
demand for the next four years as follows:

, YEARLY DEMAND

1 (IN 000s) 2 (IN 000s) 3 (IN 000s) 4 (IN 000s)

Plastic 90 32 44 55 56

Plastic 180 15 16 17 18

Plastic 360 50 55 64 67

Bronze 90 7 8 9 10

Bronze 180 3 4 5 6

Bronze 360 11 12 15 18




Both production lines can produce all the different types of nozzles. Each machine needed for
the production of bronze sprinklers requires two operators and can produce up to 12,000
sprinklers. The plastic injection molding machine needed for the plastic sprinklers requires four
operators and can produce u - ANS ✔✔Plastic

Demand for plastic sprinklers

97



115



136



141



Percentage of capacity used

48.50 ± 1%

%

Document information

Uploaded on
July 16, 2026
Number of pages
13
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$22.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Sanchy062
4.1
(26)
Sold
56
Followers
21
Items
3091
Last sold
2 weeks ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions