FLORIDA TERMITE 2026 EXAMS TEST PAPER
QUESTIONS AND ANSWERS SURE A+
✔✔When applying Bora-Care to wooden surfaces, it is important to make sure that the
wood is______?.. - ✔✔none of the above
✔✔Foam applications with Bora-Care will return to liquid in approximately _______
minutes... - ✔✔60
✔✔A supplemental termiticide treatment may be applied to concrete block or brick on
the interior of a crawl space or basement foundation.... - ✔✔true
✔✔The contract must be provided and accepted prior to _______?. - ✔✔both A & B
(any portion of work done AND any payment in part or full is received);
✔✔The contracts covering preconstruction treatments for subterranean termites shall
clearly set forth that additional treatments shall be performed to control infestations,
should one occur during ______? - ✔✔the warranty period;
✔✔For treatments for the control of subterranean termites for new construction on
multiple properties of a single owner(contractor), if individual contracts are not issued
prior to treatments, a licensee shall either: A. Enter into a master agreement with the
, owner or authorized agent prior to treatment. B. Issue an assignable contract on the
property on completion of the treatment - ✔✔A and B are both TRUE;
✔✔Prior to performing preconstruction treatments, a licensee must ______? - ✔✔obtain
an FDACS permit to perform preconstruction treatments (explanation - the permit is
automatically issued by FDACS IF YOU have a COIC for WDO and the appropriate
additional insurance coverage);
✔✔A secondary treatment using a second pesticide registered for preventative
treatments on new construction _______?.. - ✔✔may be applied according to the label;
✔✔The licensee must provide written notification to the property owner or agent of a
condition that is part of the contract's conditions, exclusions, limitations, or clauses
within _______ days of discovery, and provide the property owner the opportunity to
correct such a condition within _______ days... - ✔✔60,60
✔✔No wood destroying organism contract shall be entered into without first obtaining
_______?... - ✔✔specific written and signed notification form 13692;
✔✔Referring to basic liquid soil termiticide applications to postconstruction structures:
Applications to masonry voids are applied at the rate of _______gallons per _______
linear feet... - ✔✔2, 10
✔✔Using Figure 1: How many linear feet of interior hollow block foundation wall exists
in this structure (including the garage)?. - ✔✔240
✔✔Using Figure 1: How many linear feet of hollow bock voids exist in this structure?. -
✔✔220
✔✔Using Figure 1: How many gallons of finished termiticide would be needed to treat
the hollow block voids in this structure?.. - ✔✔44
✔✔Using Figure 1: How many gallons of finished termiticide would be needed to treat
the expansion joint exist on the back porch?... - ✔✔9.6
✔✔Using Figure 1: How many total gallons of finished termiticide are needed to treat
this structure?... - ✔✔412
✔✔Using Figure 1: Calculate the number of durable bait stations needed to treat the
exterior perimeter of this structure? - ✔✔12
✔✔You are going to pretreat a slab that measures 65 x 60 feet and has a total of 250
linear feet of perimeter walls. The walls are covered with OSB sheathing (assume
QUESTIONS AND ANSWERS SURE A+
✔✔When applying Bora-Care to wooden surfaces, it is important to make sure that the
wood is______?.. - ✔✔none of the above
✔✔Foam applications with Bora-Care will return to liquid in approximately _______
minutes... - ✔✔60
✔✔A supplemental termiticide treatment may be applied to concrete block or brick on
the interior of a crawl space or basement foundation.... - ✔✔true
✔✔The contract must be provided and accepted prior to _______?. - ✔✔both A & B
(any portion of work done AND any payment in part or full is received);
✔✔The contracts covering preconstruction treatments for subterranean termites shall
clearly set forth that additional treatments shall be performed to control infestations,
should one occur during ______? - ✔✔the warranty period;
✔✔For treatments for the control of subterranean termites for new construction on
multiple properties of a single owner(contractor), if individual contracts are not issued
prior to treatments, a licensee shall either: A. Enter into a master agreement with the
, owner or authorized agent prior to treatment. B. Issue an assignable contract on the
property on completion of the treatment - ✔✔A and B are both TRUE;
✔✔Prior to performing preconstruction treatments, a licensee must ______? - ✔✔obtain
an FDACS permit to perform preconstruction treatments (explanation - the permit is
automatically issued by FDACS IF YOU have a COIC for WDO and the appropriate
additional insurance coverage);
✔✔A secondary treatment using a second pesticide registered for preventative
treatments on new construction _______?.. - ✔✔may be applied according to the label;
✔✔The licensee must provide written notification to the property owner or agent of a
condition that is part of the contract's conditions, exclusions, limitations, or clauses
within _______ days of discovery, and provide the property owner the opportunity to
correct such a condition within _______ days... - ✔✔60,60
✔✔No wood destroying organism contract shall be entered into without first obtaining
_______?... - ✔✔specific written and signed notification form 13692;
✔✔Referring to basic liquid soil termiticide applications to postconstruction structures:
Applications to masonry voids are applied at the rate of _______gallons per _______
linear feet... - ✔✔2, 10
✔✔Using Figure 1: How many linear feet of interior hollow block foundation wall exists
in this structure (including the garage)?. - ✔✔240
✔✔Using Figure 1: How many linear feet of hollow bock voids exist in this structure?. -
✔✔220
✔✔Using Figure 1: How many gallons of finished termiticide would be needed to treat
the hollow block voids in this structure?.. - ✔✔44
✔✔Using Figure 1: How many gallons of finished termiticide would be needed to treat
the expansion joint exist on the back porch?... - ✔✔9.6
✔✔Using Figure 1: How many total gallons of finished termiticide are needed to treat
this structure?... - ✔✔412
✔✔Using Figure 1: Calculate the number of durable bait stations needed to treat the
exterior perimeter of this structure? - ✔✔12
✔✔You are going to pretreat a slab that measures 65 x 60 feet and has a total of 250
linear feet of perimeter walls. The walls are covered with OSB sheathing (assume