Which of the following should be assessed as part of the welding quality control?
A. Welder performance in a qualified laboratory.
B. Welding equipment manufacturer is recognized by the Code of construction.
C. Welding symbols and weld sizes.
ANSWER
C. Welding symbols and weld sizes. * 4.2.1.1 (a)
Before welding starts the inspector should review______________________.
A. AWS D1.1
B. Codes and Standards
C. Welder's work histories
ANSWER
B. Codes and Standards * 4.2.1
List the four potential inspector actions associated with tasks prior to welding.
A._________________________________________________
B._________________________________________________
C._________________________________________________
D._________________________________________________
ANSWER
1
, a. Identify and clarify missing details and information. *4.2.1.2 (a)
b. Identify and clarify missing weld sizes, dimensions, tests, and any additional requirements.
*4.2.1.2 (b)
c. Identify and clarify inconsistencies with standards, codes and specification requirements.
*4.2.1.2 (c)
d. Highlight potential weld problems not addressed in the design. *4.2.1.2 (d)
As part of a welding review the inspector must determine the competency of the welding
organization and the competency of the ___________________.
A. design engineer
B. welding foreman
C. inspection organization
ANSWER
C. inspection organization * 4.2.2.1 (a)
Name three items that the inspector must assure are in order before accepting NDE proce-
dures.
A.___________________________________________________________
B.___________________________________________________________
C.___________________________________________________________
ANSWER
a. NDE examiners are properly certified for the NDE technique (see 4.6) *4.2.4.1 (a)
b. NDE procedures are current and accurate. *4.2.4.1 (b)
c. Calibration of NDE equipment is current. *4.2.4.1 (c)
As regards storage ovens for welding consumables the inspector should confirm that the ov-
ens have ______________________________.
2
A. Welder performance in a qualified laboratory.
B. Welding equipment manufacturer is recognized by the Code of construction.
C. Welding symbols and weld sizes.
ANSWER
C. Welding symbols and weld sizes. * 4.2.1.1 (a)
Before welding starts the inspector should review______________________.
A. AWS D1.1
B. Codes and Standards
C. Welder's work histories
ANSWER
B. Codes and Standards * 4.2.1
List the four potential inspector actions associated with tasks prior to welding.
A._________________________________________________
B._________________________________________________
C._________________________________________________
D._________________________________________________
ANSWER
1
, a. Identify and clarify missing details and information. *4.2.1.2 (a)
b. Identify and clarify missing weld sizes, dimensions, tests, and any additional requirements.
*4.2.1.2 (b)
c. Identify and clarify inconsistencies with standards, codes and specification requirements.
*4.2.1.2 (c)
d. Highlight potential weld problems not addressed in the design. *4.2.1.2 (d)
As part of a welding review the inspector must determine the competency of the welding
organization and the competency of the ___________________.
A. design engineer
B. welding foreman
C. inspection organization
ANSWER
C. inspection organization * 4.2.2.1 (a)
Name three items that the inspector must assure are in order before accepting NDE proce-
dures.
A.___________________________________________________________
B.___________________________________________________________
C.___________________________________________________________
ANSWER
a. NDE examiners are properly certified for the NDE technique (see 4.6) *4.2.4.1 (a)
b. NDE procedures are current and accurate. *4.2.4.1 (b)
c. Calibration of NDE equipment is current. *4.2.4.1 (c)
As regards storage ovens for welding consumables the inspector should confirm that the ov-
ens have ______________________________.
2