## Section I: Programming and Site Analysis
### Questions 1-10: Project Feasibility & Client Needs Assessment
**1. A client has hired you to evaluate the feasibility of relocating their company from a single
ground-floor location to multiple floors in a new building. Which action should you take
FIRST?**
A. Interview several employees from each division of the company
B. Determine the usable floor area of each floor of the new building
C. Assess which spaces will make up the building core
D. Locate all load-bearing components on each floor
***Correct Answer: B***
**Rationale:** Determining usable floor area is the critical first step in evaluating relocation
feasibility. Without understanding the net square footage available, it is impossible to determine
if the new space can accommodate the program requirements. This action precedes detailed
space planning and ensures the building can physically accommodate the client's needs .
Employee interviews and load-bearing component analysis come later in the process.
,Page 2 of 112
**2. A designer is programming a 5,000 sq ft corporate office. Which information is MOST
critical to collect FIRST?**
A. Color preferences of the CEO
B. Number of employees and their work patterns
C. Budget for furniture
D. Preferred furniture vendors
***Correct Answer: B***
**Rationale:** Programming begins with understanding user needs, headcount, and how space
will be used. The number of employees and their work patterns form the foundation of the
program and directly impact space allocation, adjacency requirements, and furniture needs.
Aesthetics and vendor preferences come later in the design process .
---
**3. What is the BEST way to understand a client's corporate culture when developing a
program document?**
A. Conduct interviews with each user group
B. Distribute a questionnaire to all employees
C. Interview the president/CEO only
D. Tour the facility with the facility manager
***Correct Answer: A***
**Rationale:** Conducting interviews with each user group provides the most comprehensive
understanding of corporate culture. Direct interaction allows designers to observe body language,
,Page 3 of 112
ask clarifying questions, and gather nuanced information about work patterns, inter-departmental
relationships, and unspoken needs. Questionnaires, while useful, lack the depth of personal
interviews .
---
**4. You are hired to design a new office space. The client's staff has identified needs based
more on wishes than on actual requirements. What should you do?**
A. Compare input from each department to ensure requests are realistic
B. Analyze the data, form conclusions, and adjust requirements
C. Form a committee of staff members to review and adjust data
D. Ask executive management to review and determine which requests will be met
***Correct Answer: A***
**Rationale:** The designer's role in programming is to facilitate consensus and ensure program
requirements are realistic. Comparing input across departments helps identify discrepancies,
validate needs, and build consensus. This collaborative approach ensures the final program
reflects actual needs while respecting the client's desires .
---
**5. During schematic design, the client requests a change that increases square footage by 20%.
What should the designer do FIRST?**
A. Redraw all floor plans
B. Inform the client of potential budget and schedule impacts
C. Hire a contractor to provide pricing
, Page 4 of 112
D. Proceed with redesign without discussion
***Correct Answer: B***
**Rationale:** Designers must manage scope changes transparently. Budget and schedule
impacts must be communicated before proceeding with redesign. A 20% increase in square
footage will significantly affect both project cost and timeline, and the client must understand
these implications before authorizing the change .
---
**6. A designer discovers that the client's budget is 30% lower than initial estimates. What
should happen next?**
A. Continue as planned and hope for change orders later
B. Return to programming or schematic design to revise scope
C. Reduce only furniture quality
D. Blame the contractor for unrealistic estimates
***Correct Answer: B***
**Rationale:** Budget is a critical design constraint. The designer must revisit earlier phases to
adjust scope, materials, or finishes to align with the client's financial constraints. Ignoring budget
issues or making unilateral reductions without client consultation can damage trust and lead to
project failure .
---
**7. What is the primary purpose of a post-occupancy evaluation (POE)?**