Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

ASPHALT PAVING LEVEL 1 QUESTIONS WITH CORRECT ANSWERS 2026

Rating
-
Sold
-
Pages
8
Grade
A+
Uploaded on
14-07-2026
Written in
2025/2026

ASPHALT PAVING LEVEL 1 QUESTIONS WITH CORRECT ANSWERS 2026

Institution
ASPHALT
Course
ASPHALT

Content preview

ASPHALT PAVING LEVEL 1 exam practice test
actual 2026/2027 questions and 100% correct
answers
A full lot of super pave asphalt is what size?

1,000 tons

1,000 to 2000 tons

2000 to 4000 tons

1 days production - CORRECT ANSWER -2000 to 4000 tons



Which is not typically used as an asphalt binder in fdot mix designs?

PG 52-28

PG 58-22

PG 62-22

PG 76-22(PMA)

PG 82-22 (PMA) - CORRECT ANSWER -PG 62-22



Who cuts the density cores used for verification testing?

The verification technician

The contractor

The independent verification testing technician

None of the above - CORRECT ANSWER -The contractor



A full lot is composed of 5 sublots and 4 cores per lot T/F - CORRECT ANSWER -False



What is the most important for consistent compaction of asphalt mix?

The mix is hotter in temperature

The mix is colder in temperature

, The mix is uniform in temperature

Temperature of the mix does not affect compaction - CORRECT ANSWER -
The mix is uniform in temperature



Referring to general stationing guidelines, R1 would be ____ than R2

Closer to centerline

Closer to outside shoulder

Closure to the inside shoulder

Both A and C - CORRECT ANSWER -Both A and C



While using the rolling straightedge, if the needle goes in the red zone indicating an unaccepta
ble high spot in the section, you then - CORRECT ANSWER -
Mark the pavement where the needle first goes into the red zone and place another mark whe
re the needle leaves the red zone and continue



For bridge approach slabs, the 15 foot manual straightedge should be set so is on the bri
dge deck.

1 inch

Exactly 1/2 of the straightedge

The entire straightedge

None of the above - CORRECT ANSWER -1 inch



For the first transverse joint on a project place the on the new pavement while overlappin
g the transverse joint by one inch.

4 foot level

15 foot manual straight edge

Rolling straightedge

All the above - CORRECT ANSWER -15 foot manual straight edge

Written for

Institution
ASPHALT
Course
ASPHALT

Document information

Uploaded on
July 14, 2026
Number of pages
8
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$10.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller
Seller avatar
lectkevin

Get to know the seller

Seller avatar
lectkevin (self)
View profile
Follow You need to be logged in order to follow users or courses
Sold
-
Member since
1 month
Number of followers
0
Documents
271
Last sold
-

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions