STORM WATER COMPLIANCE
CONSTRUCTION COMPREHENSIVE STUDY
GUIDE TESTED QUESTIONS AND VERIFIED
ANSWERS
●● Requirements for managing stormwater activity on a construction
site are outlined in the following regulation
-NOI
-NPDES
-NOT
-DOT
Answer: NPDES
●● Which of the following is never an allowable stormwater discharge
from a construction site?
-discharge from burrow areas
-discharge from contaminated groundwater
-discharge from dewatering activities
-discharge from staging areas
Answer: discharge from contaminated groundwater
●● The notice of termination can be filed when
, -general contractor applies seed and mulch near the end of the project
-at the end of rainy season
-all construction activity, inside and outside the building, is complete
and permanent stabilization has been verified as adequate to meet permit
requirements
-only offsite street work is left
Answer: all construction activity, inside and outside the building, is
complete and permanent stabilization has been verified as adequate to
meet permit requirements
●● Relative to stormwater permitting, all of the following must occur
before construction starts except
-prepare the SWPPP
-determine the operator(s)
-submit the notice of intent (NOI)
-submit the notice of termination (NOT)
Answer: submit the notice of termination (NOT)
●● The stormwater notice of intent (NOI) must be submitted
-after the sediment discharge
-after the SWPPP is prepared and before starting construction
-after stormwater BMPs have been installed
- after stormwater inspectors issue a violation
CONSTRUCTION COMPREHENSIVE STUDY
GUIDE TESTED QUESTIONS AND VERIFIED
ANSWERS
●● Requirements for managing stormwater activity on a construction
site are outlined in the following regulation
-NOI
-NPDES
-NOT
-DOT
Answer: NPDES
●● Which of the following is never an allowable stormwater discharge
from a construction site?
-discharge from burrow areas
-discharge from contaminated groundwater
-discharge from dewatering activities
-discharge from staging areas
Answer: discharge from contaminated groundwater
●● The notice of termination can be filed when
, -general contractor applies seed and mulch near the end of the project
-at the end of rainy season
-all construction activity, inside and outside the building, is complete
and permanent stabilization has been verified as adequate to meet permit
requirements
-only offsite street work is left
Answer: all construction activity, inside and outside the building, is
complete and permanent stabilization has been verified as adequate to
meet permit requirements
●● Relative to stormwater permitting, all of the following must occur
before construction starts except
-prepare the SWPPP
-determine the operator(s)
-submit the notice of intent (NOI)
-submit the notice of termination (NOT)
Answer: submit the notice of termination (NOT)
●● The stormwater notice of intent (NOI) must be submitted
-after the sediment discharge
-after the SWPPP is prepared and before starting construction
-after stormwater BMPs have been installed
- after stormwater inspectors issue a violation