FLORIDA ELECTRICAL BUSINESS EXAM #7
EXAM WITH CORRECT ACTUAL
QUESTIONS AND CORRECTLY WELL
DEFINED ANSWERS LATEST ALREADY
GRADED A+
The CSI-MASTERFORMAT divides the specifications into
__________ specific divisions to provide a standard
reference and filing numbers for bidding and contract forms.
- ANSWERS-50
Which of the following would appear as a heading in the
index of the General Clauses and Conditions sections of
General Requirements? - ANSWERS-All of these ( General
Conditions, Notice to Bidders and Proposal)
_________ is the contractors price for performing the work
as specified. - ANSWERS-The proposal
"Contract Documents" "Insurance," "payments," and
"Guarantee" are some typical items that would be included
,under what heading in the General Clauses and Conditions
section? - ANSWERS-General Conditions
The square footage method of estimating is always
recommended for lump-sum contracts. - ANSWERS-False
The typical _______ provides the necessary control devices
for the accumulation of estimates into the final bid. -
ANSWERS-Estimate summary sheet
What type of estimate is an accurate estimating method
that consists of listing all material and labor needed for an
element of work or project - ANSWERS-Detailed Survey
_________ estimates are used as a check to determine if
sufficient materials are available to construct or complete a
project. - ANSWERS-Material
Which of the following are types of labor estimates?
I. Preliminary manpower estimates
II. Detailed manpower estimates
III.Production manpower estimates - ANSWERS-I and II only
, The satisfactory completion of the work for the stand
number of dollars in a lump-sum contract remains the
obligation of the contractor regardless of the troubles that
may be experienced in the course of construction activities.
- ANSWERS-True
The summary account can be updated on a ________ basis.
- ANSWERS-All of these ( monthly, weekly, daily)
Responsibility for job progress typically lies with ________. -
ANSWERS-the project engineer
The area of ________ is one that many times presents more
problems for the contractor then any other, and this
problem generally arises from the contractors failure to
document these formally. - ANSWERS-change orders
Which of the following is a Network Analysis technique of
project planning, scheduling, and control that is widely used
in the construction industry. - ANSWERS-All of these (Critical
Path Analysis, Critical Path Method, and Project Evaluation
and Review Technique)
EXAM WITH CORRECT ACTUAL
QUESTIONS AND CORRECTLY WELL
DEFINED ANSWERS LATEST ALREADY
GRADED A+
The CSI-MASTERFORMAT divides the specifications into
__________ specific divisions to provide a standard
reference and filing numbers for bidding and contract forms.
- ANSWERS-50
Which of the following would appear as a heading in the
index of the General Clauses and Conditions sections of
General Requirements? - ANSWERS-All of these ( General
Conditions, Notice to Bidders and Proposal)
_________ is the contractors price for performing the work
as specified. - ANSWERS-The proposal
"Contract Documents" "Insurance," "payments," and
"Guarantee" are some typical items that would be included
,under what heading in the General Clauses and Conditions
section? - ANSWERS-General Conditions
The square footage method of estimating is always
recommended for lump-sum contracts. - ANSWERS-False
The typical _______ provides the necessary control devices
for the accumulation of estimates into the final bid. -
ANSWERS-Estimate summary sheet
What type of estimate is an accurate estimating method
that consists of listing all material and labor needed for an
element of work or project - ANSWERS-Detailed Survey
_________ estimates are used as a check to determine if
sufficient materials are available to construct or complete a
project. - ANSWERS-Material
Which of the following are types of labor estimates?
I. Preliminary manpower estimates
II. Detailed manpower estimates
III.Production manpower estimates - ANSWERS-I and II only
, The satisfactory completion of the work for the stand
number of dollars in a lump-sum contract remains the
obligation of the contractor regardless of the troubles that
may be experienced in the course of construction activities.
- ANSWERS-True
The summary account can be updated on a ________ basis.
- ANSWERS-All of these ( monthly, weekly, daily)
Responsibility for job progress typically lies with ________. -
ANSWERS-the project engineer
The area of ________ is one that many times presents more
problems for the contractor then any other, and this
problem generally arises from the contractors failure to
document these formally. - ANSWERS-change orders
Which of the following is a Network Analysis technique of
project planning, scheduling, and control that is widely used
in the construction industry. - ANSWERS-All of these (Critical
Path Analysis, Critical Path Method, and Project Evaluation
and Review Technique)