2026 Exam All Answers and
Illustrations Given
In terms of occupant health, which of the following lamp types is BEST
used in a bedroom?
(A) LED lamp
(B) Fluorescent lamp
(C) Incandescent lamp
(D) Clear mercury vapor lamp - ANSWER ✔✔(C) Incandescent lamp
A digital signage monitor is going to be installed in an elevator lobby,
with the bottom edge at 36" [914 mm] AFF. What does the designer need
to confirm with the signage vendor?
,(A) The monitor depth will not project into the corridor
(B) The monitor depth will not project more than 4" [102 mm] into the
corridor (C) The monitor depth will not project more than 7" [178 mm]
into the corridor (D) The monitor depth will not project more than 12"
[305 mm] into the corridor - ANSWER ✔✔(B) The monitor depth will
not project more than 4" [102 mm] into the corridor
When designing a stair with open risers, what is the maximum opening
between treads?
(A) The opening must not allow a 2" [51 mm] sphere to pass through
(B) The opening must not allow a 4" [102 mm] sphere to pass through
(C) The opening must not allow a 7" [178 mm] sphere to pass through
(D) The opening must not allow an 11" [279 mm] sphere to pass through
- ANSWER ✔✔(B) The opening must not allow a 4" [102 mm] sphere
to pass through
Which wall construction will provide the BEST speech privacy for a
conference room?
(A) Full height 1/2" thick frameless glass storefront system with frosted
film
, (B) Full height 3/4" thick frameless glass storefront system with frosted
film
(C) Full height wood stud with one layer of 5/8" thick gypsum board on
each side (D) Full height metal stud with one layer of 5/8" thick gypsum
board on each side - ANSWER ✔✔(D) Full height metal stud with one
layer of 5/8" thick gypsum board on each side
What is the typical height of the cut plane, when generating a floor plan?
(A) At the floor line
(B) 4'-0" [1210 mm] above the floor line (C) 6' 0" [1828 mm] above the
floor line (D) 8' 0" [2420 mm] above the floor line - ANSWER ✔✔(B)
4'-0" [1210 mm] above the floor line
An abstract diagram that represent the program's spaces, activities, and
circulation patterns is called a:
(A) bubble diagram
(B) adjacency matrix
(C) blocking diagram
(D) preliminary space plan - ANSWER ✔✔(A) bubble diagram
For a kitchen remodeling client presentation, which drawing type will be
the MOST effective?
COPYRIGHT©PROFFKERRYMARTIN 2025/2026. YEAR PUBLISHED 2026. COMPANY REGISTRATION NUMBER: 619652435. TERMS OF USE.
PRIVACY STATEMENT. ALL RIGHTS RESERVED