Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 17 pages
Exam (elaborations)

ACI CONCRETE FIELD TESTING TECHNICIAN GRADE I EXAM Q&A |

Document preview thumbnail
Preview 3 out of 17 pages

Prepare for the ACI Concrete Field Testing Technician Grade I Exam with this comprehensive study guide featuring practice questions and detailed answers. Covers concrete sampling, slump testing, air content, temperature measurement, unit weight, molding and curing test specimens, ASTM testing procedures, quality control, field testing techniques, safety standards, and ACI certification requirements. Ideal for technicians, inspectors, contractors, and construction professionals preparing for ACI Grade I certification. Updated for the testing period.

Content preview

ACI Concrete Field Testing Technician-
Grade I exam questions and answers

The sensor of the temperature measuring device shall be submerged a minimum of in.
[ mm] into the freshly mixed concrete. - answer 3 in. [75 mm]



The temperature measuring device shall have a capacity of measuring temperature of freshly
mixed concrete to +- degrees F [+- C] throughout a range of _______ answer 1
degree F [0.5 C], 30 degrees F to 120 F [0 C to 50 C]



The temperature measuring device shall be calibrated , or whenever there is a question
of . - answer Annually, accuracy



The temperature of concrete may be measured in a wheelbarrow. True or False? - answer
True



The temperature of concrete may be measured in a wall form. True of False - answer True



A composite sample of concrete is required even if the only purpose for obtaining the sample
is to determine temperature. True of False? - answer False



What must be done to the sample container prior to sampling the concrete? - answer
Dampen (with water)

,What must be done to the concrete surrounding the temperature measuring device after the
device is submerged in the fresh concrete. - answer Gently press the concrete around the
temperature measuring device at the surface of the concrete



How long must the temperature measuring device remain in the freshly mixed concrete? -
answer At least 2 minutes but not more than 5 minutes



After the temperature of the concrete is read, what is required? - answer Reporting of
temperature



The temperature of concrete is reported to the nearest degrees F [ ____ C] - answer 1
degree F [0.5 C]



According to ASTM C1064, what is one reason to take the temperature of concrete? - answer
Verify conformance to a specified requirement for temperature of concrete



A maximum temperature of freshly mixed concrete is specified in ASTM C1064. True of False?
- answer False



The sample of concrete used for temperature determination must be rodded 25 times. True
or False? - answer False



Sampling by this method is required when tests are to be made to determine with
specification requirements. - answer Compliance



This method covers sampling from four types of mixtures which are , , , and
. - answer Stationary mixers, paving mixers, revolving drum mixers, and open top
mixers

, The maximum allowable time between obtaining the first and final portions of a composite
sample is _____ minutes. - answer 15



Portions of a composite sample shall be thoroughly remixed bfore beginning tests on the
sample. True of False? - answer True



The maximum elapsed time allowed between obtaining the final portion of the composite
sample and beginning the tests for slump, temperature, and air content is minutes. -
answer 5



The molding of strength test specimens shall begin within minutes after fabricating the
composite sample. - answer 15



The concrete sample must be protected from contamination and . - answer Rapid
evaporation



The minimum size sample for making strength test specimens is . - answer 28 L (1ft^3)



When sampling from a stationary mixer, the batch must be sampled at or more
regularly spaced intervals during discharge of the middle portion of the batch - answer 2



The composite sample for a paving mixer must represent a minimum of different
portions of the batch of concrete taken from the pile after discharge. - answer 5



When sampling from a revolving drum truck mixer, concrete must be sampled at a minimum
of regularly spaced intervals during discharge of the middle portion of this batch. -
answer 2

Document information

Uploaded on
July 11, 2026
Number of pages
17
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$11.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
0
Followers
0
Items
356
Last sold
-


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions