AND ANSWERS RATED A+
✔✔8P8C termination procedure (RJ 45) (8 position 8 contact) - ✔✔Step one - remove
cable sheath,
step two - remove memory and arrange conductors,
step three - cut conductors per manufacturers instructions the measurement varies with
the plug manufacturer remember to read the manufactures and instructions before
starting the task,
step four - slide conductors into plug and confirm the conductors are properly seated
and in the correct order before cremping the connector,
step five - crimp the plug
✔✔Terminating at a patch panel procedure - ✔✔Step one - route the cables to the point
of termination,
step two - cut off the excess cable,
step three - security and label the cables,
Step four - fan the conductors into the termination block,
step five Dash terminate the conductors with the proper termination tool
✔✔Work area outlet termination procedure - ✔✔Step one - observe the color code,
step two - remove the sheets and label the cable,
step three - fan the conductor onto the jack,
, step four - terminate the conductors using the proper termination tool,
step five Dash install the cable strain relief,
step six - install determinate a jack face plate or modular patch panel,
step seven Dash label the port
✔✔Define bonding - ✔✔Connection intended to safely and effectively equalize the
potential differences between to items Joining two pieces together
✔✔What are the three main bonding and grounding components that must be installed
in every facility - ✔✔AC grounding electrode system, equipment grounding system,
telecommunications bonding infrastructure
✔✔What is the main purpose of a PBB - ✔✔Serves as the dedicated extension of a
buildings AC grounding electrode system for the telecommunications bonding
infrastructure
✔✔What are the recommendations for placing a BBC in a multi story building - ✔✔At
the top floor and every third floor
✔✔What is the minimum recommendation AWG size for a BBC - ✔✔Six
✔✔What is the recommended maximum value for the bonding resistance between the
two points on a bonded surface - ✔✔0.1 ohms
✔✔Grounding and bonding design specifications are in which standards in NEC article -
✔✔ANSI standard 607; NEC articles 250, 800
✔✔Secondary protectors are installed to handle - ✔✔Sneak currents
✔✔What is the preferred method for installing backbone cable in vertical pathways -
✔✔Top down (gravity)
✔✔How should you secure a work site before a pull begins - ✔✔Set up cones barriers
signages caution tape notify appropriate personnel
✔✔What can we use to minimize cabling twisting and wrapping around themselves
during a pull - ✔✔Swivel
✔✔The maximum pulling tension for three 4 pair UTP cable's during installation is -
✔✔25 pounds