• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 9 pages
Exam (elaborations)

SWM DEQ Exam Question and Answer (2026/2027) | Updated Questions and Correct Answers | A+ Verified

Document preview thumbnail
Preview 2 out of 9 pages

SWM DEQ Exam Question and Answer (2026/2027) | Updated Questions and Correct Answers | A+ Verified

Content preview

SWM DEQ Exam Question and Answer
(2026/2027) | Updated Questions and
Correct Answers | A+ Verified
• what is the site-based load limit for water quality? -✓✓ 0.41 lbs/acre/yr total
phosphorous


• Virginia Runoff Reduction Method- method of load calculations -✓✓ load
calculations based on land cover type and soil type.


• what must happen to potentially harmful sheet flow runoff? -✓✓ Must be
diverted to stormwater conveyance system.


• SWM ponds must be able to convey water safely up to what level storm event?
-✓✓ must be able to safely convey up to a 100 yr storm.


• Define LDA -✓✓ Land disturbing activity; any man-made change to the land
surface that potentially changes its runoff characteristics; includes clearing,
grading, and excavation.


• What size LDA must comply with stormwater management regulation? in CPBA
areas? -✓✓ anything of 1 acre or more, or 2500 ft^2 in CPBA areas; may be more
stringent locally.


• what are some activities exempt from SWM regulations? -✓✓ mining,
agriculture, sewer discharges, local reclamation programs, routine maintenance
of preexisting operations, public emergency activity

, • what term basically means a plea deal for stormwater offenders? -✓✓ consent
order, which replaces penalties with fines.


• how long does VSMP authority have to review SWM plan? -✓✓ 15 days to
review and determine approval, and notify applicant.


• How often must a VSMP authority inspect an LDA? -✓✓ Periodically.


• all SWPPP requirements may be met by -✓✓ incorporating other plans into
reference, or by developing missing elements.


• What must the DEQ issue to an operator before an LDA? -✓✓ a construction GP


• How soon after final grade of a site must vegetation be put in place? -✓✓ within
7 days.


• How long must operator keep routine inspection reports? -✓✓ At least 3 years
after the GP expires/terminates.


• How long does operator have to revise SWPPP if authority deems it necessary?
How long does local authority have to review any modifications to SWPPP? -✓✓ 7
days for operator to make changes, 60 days for authority to review changes.

Document information

Uploaded on
July 8, 2026
Number of pages
9
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$11.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
PassHub
5.0
(2)
Sold
11
Followers
1
Items
2421
Last sold
1 week ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions