• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 14 pages
Exam (elaborations)

SWM DEQ Exam Question and Answer (2026/2027) | Updated Questions and Correct Answers | Final Review

Document preview thumbnail
Preview 2 out of 14 pages

SWM DEQ Exam Question and Answer (2026/2027) | Updated Questions and Correct Answers | Final Review

Content preview

SWM DEQ Exam Question and Answer
(2026/2027) | Updated Questions and
Correct Answers | Final Review
• The Virginia Stormwater Management Program is authorized by the ______ and
administered through the ______ . CORRECT ANSWER: Virginia Stormwater
Management Act, Virginia Stormwater Management Program Regulation


• VPDES Permit/Construction GP authorizes discharge of stormwater from
construction activities that are . CORRECT ANSWER: greater than or equal to an
acre


• The Stormwater Management Act requires the State Water Control Board to .
CORRECT ANSWER: permit, regulate, and control stormwater runoff


• DEQ has ___ days to complete review of real or potential inter-jurisdictional
impacts upon request . CORRECT ANSWER: 90


• The Stormwater Management Act requires the following individuals to obtain
and maintain a certificate of competency . CORRECT ANSWER: staff of a
stormwater program, anyone contracted by a VSMP authority, standard and
specification holders


• The dual certificate will expire three years from . CORRECT ANSWER: the latest
date of the certificates


• SWM plan must be approved by ___ before land disturbance . CORRECT
ANSWER: VSMP program authority

, • The water quality criteria sets a site-based load limit of ____ of total
phosphorus for new development . CORRECT ANSWER: 0.41 lbs/acre/year


• The phosphorus load limit uses the . CORRECT ANSWER: 10% impervious cover


• Part II B and II C water quantity criteria addresses . CORRECT ANSWER: channel
protection and flood protection


• Which two plans in the SWPPP must be approved? . CORRECT ANSWER: SWM
plan, ESC plan


• Does the SWM plan address runoff during or after construction? . CORRECT
ANSWER: post-construction


• What is the lower limit of the range of imperviousness that can result in stream
degradation? . CORRECT ANSWER: 10%


• What do land disturbing activities consist of? . CORRECT ANSWER: excavating,
clearing, grading


• LDA threshold for the SWM Act and Regulation . CORRECT ANSWER: 1 acre or
2500 square feet for Chesapeake Bay Preservation Act


• In situations where an initial exemption was applicable because LDAs were
related to emergency work, VSMP authority shall be advised of the disturbance

Document information

Uploaded on
July 8, 2026
Number of pages
14
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$11.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
PassHub
5.0
(2)
Sold
11
Followers
1
Items
2421
Last sold
1 week ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions