3 - Providing additional support bars for the tendons - Answer 1 - Reverse curvature of
tendons in post-tensioned concrete construction can be avoided by _________________.
1 - Increasing the psi of the concrete
2 - Increasing the tension in the tendons
3 - Providing additional support bars for the tendons
4 - Providing additional tendons
2 - 24 hours - Answer 2 - A watertight cap should be installed on an encapsulated system for
post-tensioned concrete within ______hours after stressing is complete.
1 - 12 hours
2 - 24 hours
3 - 36 hours
4 - 72 hours
2 - 60 - Answer 3 - Where two or more extensions of the stressing jack are required to
achieve the required elongation for post-tensioned concrete, the final pull on the jack should
not exceed _____________%.
1 - 15
2 - 60
3 - 75
4 - 80
3 - 75 - Answer 4 - Tendons in post-tensioned concrete should not be stressed until the
concrete has reached about ________% of its full strength.
1 - 60
2 - 65
3 - 75
4 - 80
, 2 - 6 inches - Answer 5 - A minimum clearance of _________inches should be maintained
around all block outs in post-tensioned construction.
1 - 4 inches
2 - 6 inches
3 - 8 inches
4 - 12 inches
4 - 12 - Answer 6 - If a tendon used in a post-tensioned concrete slab is to be stressed from
both ends, at least ____ inches of tendon tail should be left outside the edge form at each end
for stressing.
1-3
2-6
3 - 10
4 - 12
4 - 80 - Answer 7 - The back stressing force applied to barrier cables should be equal to _____
% of the ultimate strength of the cable.
1 - 50
2 - 60
3 - 75
4 - 80
3 - 5 - Answer 8 - Not more than _______ 0.5" diameter tendons should be banded together
in a group in post-tensioned concrete.
1-3
2-4
3-5
4-6
1 - 1 inch - Answer 9 - W hat is the maximum that sheathing should be cut back on tendons?
1 - 1 inch