An architect is working on a large office building of Type V construction. A week
before the 100% schematic design (SD) deliverable is due to the client, the architect
conducts an internal review of the documents to confirm that the deliverable aligns
with SD standards.


Which of the following review items should be included in the SD quality review
checklist?
a)Complete procurement documents associated with allowances and unit prices.
b)Review private office count and square footage needs with current architectural
plan.
c)Confirm structural engineer's documentation of final details to relocate existing
columns.
d)Coordinate plumbing engineer's details with civil engineer's plan for fire protection
service.


Give this one a try later!


b)review private office count and square footage needs with current
architectural plan.

Explanation: Review of programming needs with the current plan is

, appropriate for an SD quality review process.


Topic: Project Quality Control




An architect is responding to an RFP for a ground-up research laboratory located on
a wetland site. The site includes new road access and must be designed to meet local
codes and ordinances.


Which of the following subconsultants should the architect include on their project
team? Check the four that apply.
-Environmental engineer
-MEP engineer
-Construction manager
-Civil engineer
-Landscape architect
-Site surveyor


Give this one a try later!


-Environmental engineer
-MEP engineer
-Civil engineer
-Landscape architect

Explanation: Because the project will be located in a wetland and will
require expertise in evaluating and designing for this type of environment.
Because a laboratory building will require specialty expertise in
mechanical, electrical, and plumbing. Because the project is located in a
wetland and will require expertise in how to bring road and infrastructure
to the site.Because the site around the building must be landscaped to
meet local codes and ordinances.

Topic: Resource Management

, An owner places a project on hold after receiving completed construction
documents from the architect. After six months, the owner requests that the project
continue into the bidding phase.


According to AIA B101, how should the architect proceed?
a)Adjust the cost of work to reflect changes in the construction market.
b)Prepare a change order and submit it to the owner for approval.
c)Revise billable rates for architectural staff and consultants.


Give this one a try later!


a)adjust the cost of work to reflect changes in the construction market.

Explanation: The B101 agreement stipulates that if the bidding phase doesn't
start within 90 days after the architect submits construction documents, the
owner's budget is to be adjusted to reflect changes in costs for
construction. (Section 6.4)

Topic: Contracts




An architect is preparing an initial project budget using the following fee information:
There is a total fee of $300,000 for the entire project team.
40% of the total fee is allocated for all consultants.
8% of the net fee is allocated for the architect's non-reimbursable expenses.
7% of the net fee is allocated for the architect's contingency.
What is the available budget for project labor?
a)$153,000
b)$165,000
c)$180,000


Give this one a try later!

Document information

Uploaded on
July 7, 2026
Number of pages
17
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$10.50

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
scholarmotivator
4.1
(16)
Sold
148
Followers
48
Items
6079
Last sold
1 week ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions