When a market operation center's data link to PJM is down, the dispatcher must
manually update the tele-failed data to PJM
A) continuously
B) every 30 minutes
C) every hour
D) every 8 hour
Give this one a try later!
B) every 30 minutes
Which of the following events may prompt PJM to adopt conservative operations
(select 2)
- A member company has received a credible bomb threat against one of their BES
substations
,- A steam generating unit cannot reach full MVAR output because of plugged heat
exchangers on the generator cooling system
- NOAA has reported a solar storm of K6 intensity is currentlu being experienced
- A natural gas pipeline that supplies gas to several CTs has developed a leak and gas
supplies will be limited while repairs are made
Give this one a try later!
- A natural gas pipeline that supplies gas to several CTs has developed a
leak and gas supplies will be limited while repairs are made
- A member company has received a credible bomb threat against one of
their BES substations
Regulation updates can be made no later than ______.
A) Noon for the off peak days
B) 6am for the current operating day
C) 60 minutes prior to the beginning of the desired operating hour ending
D) 14:15 the day before the operating day
Give this one a try later!
C) 60 minutes prior to the beginning of the desired operating hour ending
Which of the following statements is true concerning the characteristics of a
generator's governor control?
A) Governors control generation excitement
B) Governors adjust generation for large changes in load
C) Governors operate by adjusting the input to the rotor
D) Governor control varies according to plant design
Give this one a try later!
, D) Governor control varies according to plant design
All regulation offers must be submitted to PJM no later than _______.
A) 1415 EPT the day before the operating day
B) 1200 EPT the day after the operating day
C) 90 minutes prior to the delivery hour of the operating day
D) Noon time the day before the operating day
Give this one a try later!
A) 1415 EPT the day before the operating day
Then minimum passing score for a unit regulation test is ________.
A) 50% compliance with the test signal
B) 75% compliance with the test signal
C) 90% compliance with the test signal
D) 100% compliance with the test signal
Give this one a try later!
B) 75% compliance with the test signal
Which of the following reports will PJM request when a Maximum Generation
Emergency Alert is issued?
A) Instantaneous Reserve Check
B) Minimum Generation Report
, C) Reactive Reserve Report
D) Supplemental Status Report
Give this one a try later!
D) Supplemental Status Report
When are regulation assignments are posted on eMKT?
A) 1600 the day prior to operating day
B) 60 minutes prior to operating hour
C) 30 minutes prior to operating hour
D) PJM operator will call all units assigned regulation
Give this one a try later!
C) 30 minutes prior to operating hour
Operating reserve must equal the sum of
A) synchronized, non-synchronized and secondary.
B) non-synchronized, secondary and over thirty.
C) synchronized, over thirty and non-synchronized.
D) secondary, over thirty and synchronized.
Give this one a try later!
A) synchronized, non-synchronized and secondary.
manually update the tele-failed data to PJM
A) continuously
B) every 30 minutes
C) every hour
D) every 8 hour
Give this one a try later!
B) every 30 minutes
Which of the following events may prompt PJM to adopt conservative operations
(select 2)
- A member company has received a credible bomb threat against one of their BES
substations
,- A steam generating unit cannot reach full MVAR output because of plugged heat
exchangers on the generator cooling system
- NOAA has reported a solar storm of K6 intensity is currentlu being experienced
- A natural gas pipeline that supplies gas to several CTs has developed a leak and gas
supplies will be limited while repairs are made
Give this one a try later!
- A natural gas pipeline that supplies gas to several CTs has developed a
leak and gas supplies will be limited while repairs are made
- A member company has received a credible bomb threat against one of
their BES substations
Regulation updates can be made no later than ______.
A) Noon for the off peak days
B) 6am for the current operating day
C) 60 minutes prior to the beginning of the desired operating hour ending
D) 14:15 the day before the operating day
Give this one a try later!
C) 60 minutes prior to the beginning of the desired operating hour ending
Which of the following statements is true concerning the characteristics of a
generator's governor control?
A) Governors control generation excitement
B) Governors adjust generation for large changes in load
C) Governors operate by adjusting the input to the rotor
D) Governor control varies according to plant design
Give this one a try later!
, D) Governor control varies according to plant design
All regulation offers must be submitted to PJM no later than _______.
A) 1415 EPT the day before the operating day
B) 1200 EPT the day after the operating day
C) 90 minutes prior to the delivery hour of the operating day
D) Noon time the day before the operating day
Give this one a try later!
A) 1415 EPT the day before the operating day
Then minimum passing score for a unit regulation test is ________.
A) 50% compliance with the test signal
B) 75% compliance with the test signal
C) 90% compliance with the test signal
D) 100% compliance with the test signal
Give this one a try later!
B) 75% compliance with the test signal
Which of the following reports will PJM request when a Maximum Generation
Emergency Alert is issued?
A) Instantaneous Reserve Check
B) Minimum Generation Report
, C) Reactive Reserve Report
D) Supplemental Status Report
Give this one a try later!
D) Supplemental Status Report
When are regulation assignments are posted on eMKT?
A) 1600 the day prior to operating day
B) 60 minutes prior to operating hour
C) 30 minutes prior to operating hour
D) PJM operator will call all units assigned regulation
Give this one a try later!
C) 30 minutes prior to operating hour
Operating reserve must equal the sum of
A) synchronized, non-synchronized and secondary.
B) non-synchronized, secondary and over thirty.
C) synchronized, over thirty and non-synchronized.
D) secondary, over thirty and synchronized.
Give this one a try later!
A) synchronized, non-synchronized and secondary.