What is the purpose of the maximum generation emergency action?
Give this one a try later!
To increase generation above the maximum economic level
PJM will give this information when reserve alerts and warnings are issued (except
Unit Startup Notification Alert)
Give this one a try later!
PJM will give you the amount of estimated operating reserve capacity and
the actual requirement.
,PJM Actions during a Primary Reserve Warning
Give this one a try later!
Assure all available equipment is scheduled and requested secondary
reserve brought to primary reserve status. Ensure deferrable maintenance
has been halted. Notifies PJM public information personnel
PJM actions during a Voltage Reduction Warning
Give this one a try later!
Notify Department of Energy and PJM public information personnel
All secondary and primary reserve* is brought to a synchronized reserve
status and emergency operating capacity is scheduled from adjacent
systems
*Excludes restricted max emerg capacity
What is the purpose of the heavy load voltage schedule warning?
Give this one a try later!
To prepare for maximum support of voltages on the bulk power system
What is the purpose of the Pre-Emergency Load Management Reduction Action?
, Give this one a try later!
To provide additional load relief by using PJM controllable load
management programs (Relief is expected to be required after initiating
Maximum Emergency Generation)
What system is used to issue NERC Energy Emergency Alerts?
Give this one a try later!
The Reliability Coordinators Information System (RCIS)
Who does the pre-emergency load management reduction action apply to?
Give this one a try later!
Any site registered in the PJM Demand Response Program as a Demand
Resource type that needs 30, 60, or 120 minute lead time to make its
reductions
Reductions are mandatory when dispatched during the product availability
window
Minimum dispatch duration is 1 hour
During reserve deficiencies, what other measures can be taken to maintain system
reliability?
Give this one a try later!
Give this one a try later!
To increase generation above the maximum economic level
PJM will give this information when reserve alerts and warnings are issued (except
Unit Startup Notification Alert)
Give this one a try later!
PJM will give you the amount of estimated operating reserve capacity and
the actual requirement.
,PJM Actions during a Primary Reserve Warning
Give this one a try later!
Assure all available equipment is scheduled and requested secondary
reserve brought to primary reserve status. Ensure deferrable maintenance
has been halted. Notifies PJM public information personnel
PJM actions during a Voltage Reduction Warning
Give this one a try later!
Notify Department of Energy and PJM public information personnel
All secondary and primary reserve* is brought to a synchronized reserve
status and emergency operating capacity is scheduled from adjacent
systems
*Excludes restricted max emerg capacity
What is the purpose of the heavy load voltage schedule warning?
Give this one a try later!
To prepare for maximum support of voltages on the bulk power system
What is the purpose of the Pre-Emergency Load Management Reduction Action?
, Give this one a try later!
To provide additional load relief by using PJM controllable load
management programs (Relief is expected to be required after initiating
Maximum Emergency Generation)
What system is used to issue NERC Energy Emergency Alerts?
Give this one a try later!
The Reliability Coordinators Information System (RCIS)
Who does the pre-emergency load management reduction action apply to?
Give this one a try later!
Any site registered in the PJM Demand Response Program as a Demand
Resource type that needs 30, 60, or 120 minute lead time to make its
reductions
Reductions are mandatory when dispatched during the product availability
window
Minimum dispatch duration is 1 hour
During reserve deficiencies, what other measures can be taken to maintain system
reliability?
Give this one a try later!